Permit Number - T22CM06116
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073
Start Date Submittal Complete Date Status  
12/20/2022 RESIDENTIAL NEW DWELLING v.1 01/05/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T22CM06116
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073
Total Outstanding Activity Conditions - 4
Date Name
08/10/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
08/10/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
08/10/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/10/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2020-095/P22WP00021 IS ACCEPTED AND RELEASED BYPCRWRD

Conditions

Permit Number - T22CM06116
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073
Date Description Comments
08/12/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM06116
Permite Description: SFR MER1301600 T21-M0073
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM06116
Permit Description: SFR MER1301600 T21-M0073
Total Completed Inspections - 24
Date Description Inspector Results Comments
10/07/2022 COT - RSPL - Yard Water Line Passed {Activity date: 10/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/03/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE} ; {Activity date: 09/28/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - Cancel all inspections, building does not meet the site set-backs

}
10/07/2022 COT - RSPL - Rough Soil Passed {Activity date: 10/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/03/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - . DE
Install string line between all lots being inspected to show property pins.} ; {Activity date: 09/28/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - Cancel all inspections, building does not meet the site set-backs

}
10/18/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 10/18/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP}
10/18/2022 COT - RSBU - Preslab Passed {Activity date: 10/18/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP}
10/18/2022 COT - RSEL - Electrical Underground Passed {Activity date: 10/18/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP}
10/18/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 10/18/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP}
01/23/2023 COT - RSBU - Exterior Clips/Sheathing Passed
01/23/2023 COT - RSBU - Roof Nailing Passed
02/22/2023 RSME - Mechanical Progress Passed
02/22/2023 COT - LCBU - Framing Passed
02/22/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
02/22/2023 COT - RSPL - Gas Pressure Test Passed
02/22/2023 COT - LCPL - Plumbing Intermediate Passed
02/22/2023 COT - RSEL - Construction Power Passed
03/14/2023 COT - HCBU - Interior Shear Bracing Passed
04/21/2023 COT - RSPL - Sewer Passed
05/03/2023 COT - BULD - SWG Clearance Passed SWG clearance required
05/03/2023 COT - RSPL - Plumbing Final Passed
05/18/2023 ENGR Engineering Final Passed
05/26/2023 BULD - Electrical Clearance Passed
05/26/2023 RSBU - Building Final Passed
05/26/2023 COT - RSEL - Outdoor Lighting Passed
05/26/2023 COT - RSME - Mechanical Final Passed
05/26/2023 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 23 PERMIT T22CM06116 REVISION_V1.PDF DOCUMENTS VIEW
LOT 23 REVISED PLOT PLAN_V1.PDF DOCUMENTS VIEW
REV 1-PERMIT T22CM06116 LETTER CITY OF TUCSON - LOT 23_V1.PDF DOCUMENTS VIEW