Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM06116
Permit Details
Apply Date:
08/10/2022
Applicant:
Dana Petty
Description:
SFR MER1301600 T21-M0073
Permit Reviews
Permit Number - T22CM06116
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/20/2022 | RESIDENTIAL NEW DWELLING v.1 | 01/05/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM06116
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
08/10/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
08/10/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
08/10/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
08/10/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-095/P22WP00021 IS ACCEPTED AND RELEASED BYPCRWRD |
Conditions
Permit Number - T22CM06116
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073
Date | Description | Comments |
---|---|---|
08/12/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM06116
Permite Description: SFR MER1301600 T21-M0073
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM06116
Permit Description: SFR MER1301600 T21-M0073
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/07/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/03/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE} ; {Activity date: 09/28/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - Cancel all inspections, building does not meet the site set-backs } |
|
10/07/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/03/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - . DE Install string line between all lots being inspected to show property pins.} ; {Activity date: 09/28/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - Cancel all inspections, building does not meet the site set-backs } |
|
10/18/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} | |
10/18/2022 | COT - RSBU - Preslab | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} | |
10/18/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} | |
10/18/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} | |
01/23/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
01/23/2023 | COT - RSBU - Roof Nailing | Passed | ||
02/22/2023 | RSME - Mechanical Progress | Passed | ||
02/22/2023 | COT - LCBU - Framing | Passed | ||
02/22/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
02/22/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
02/22/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
02/22/2023 | COT - RSEL - Construction Power | Passed | ||
03/14/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
04/21/2023 | COT - RSPL - Sewer | Passed | ||
05/03/2023 | COT - BULD - SWG Clearance | Passed | SWG clearance required | |
05/03/2023 | COT - RSPL - Plumbing Final | Passed | ||
05/18/2023 | ENGR Engineering Final | Passed | ||
05/26/2023 | BULD - Electrical Clearance | Passed | ||
05/26/2023 | RSBU - Building Final | Passed | ||
05/26/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
05/26/2023 | COT - RSME - Mechanical Final | Passed | ||
05/26/2023 | COT - RSEL - Electrical Final | Passed |