Permit: T22CM06099
Permit Details
Apply Date:
08/10/2022
Applicant:
Raphael Ambeliz
Description:
Patio Cover (Engineered)
Permit Reviews
Permit Number - T22CM06099
Permit Status: Issued
Permit Description: Patio Cover (Engineered)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/10/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 09/01/2022 | COMPLETED |
09/26/2022 | RESUBMITTAL | 09/28/2022 | COMPLETED |
10/15/2022 | RESUBMITTAL | 10/18/2022 | COMPLETED |
11/30/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 12/13/2023 | APPROVED |
03/05/2023 | RESIDENTIAL NEW DWELLING v.1 | 04/03/2023 | APPROVED |
10/31/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/31/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - T22CM06099
Permit Status: Issued
Permit Description: Patio Cover (Engineered)
Date | Description | Comments |
---|---|---|
09/27/2022 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
04/03/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit. |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM06099
Permit Description: Patio Cover (Engineered)
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/06/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 6/6/23: excavation/rebar/zoning passed | |
07/31/2023 | COT - BULD - SWG Clearance | Passed | Approved in sleeve to meter location, SWG clearance is required | |
07/31/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
08/17/2023 | BULD - Electrical Clearance | Passed | No clearance required; service,is,currently active | |
08/17/2023 | COT - RSBU - Roof Nailing | Passed | Metal roof system. | |
08/17/2023 | COT - RSPL - Plumbing Final | Passed | ||
10/12/2023 | RSBU - Building Final | Passed | ||
10/12/2023 | COT - RSEL - Electrical Final | Passed | ||
10/12/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |