Permit: T22CM06093
Permit Details
Apply Date:
08/09/2022
Applicant:
Description:
Renovation of the South building with minor site improvements (under separate review).
Permit Reviews
Permit Number - T22CM06093
Permit Status: Complete
Permit Description: Renovation of the South building with minor site improvements (under separate review).
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/09/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 09/16/2022 | COMPLETED |
| 10/01/2022 | RESUBMITTAL | 10/17/2022 | COMPLETED |
| 10/18/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/26/2023 | APPROVED |
| 05/09/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/15/2023 | APPROVED |
| 09/25/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/26/2023 | APPROVED |
| 02/16/2023 | COMMERCIAL REVIEW - FULL v.2 | 03/24/2023 | APPROVED |
| 11/04/2022 | COMMERCIAL REVIEW - FULL v.1 | 12/15/2022 | REQUIRES RESUBMIT |
| 10/04/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/09/2023 | APPROVED |
Conditions
Permit Number - T22CM06093
Permit Status: Complete
Permit Description: Renovation of the South building with minor site improvements (under separate review).
| Date | Description | Comments |
|---|---|---|
| 12/15/2022 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
| 10/25/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 10/25/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 05/12/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM06093
Permite Description: Renovation of the South building with minor site improvements (under separate review).
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2023 | COT - HCBU - Building Above Ceiling | N/A | Partial Pass | |
| 08/11/2023 | COT - BULD - SWG Clearance | N/A | Not Applicable | SWG clearance is not required |
| 06/14/2023 | COT - HCBU - Building Progress | N/A | Partial Pass | 6-14-23: Rough framing of metal stud walls for offices, restrooms, and conference rooms is complete. Okay to apply drywall to one side of framing until intermediate inspection is ready. |
| 06/27/2023 | COT - HCME - Mechanical Above Ceiling | N/A | Partial Pass | above hard lids |
| 06/27/2023 | COT - HCEL - Electrical Above Ceiling | N/A | Partial Pass | above hard lids |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM06093
Permit Description: Renovation of the South building with minor site improvements (under separate review).
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/10/2023 | COT - HCPL - Rough Soil | Passed | Approved. Okay to backfill. Shading is required. 4/10/2023 | |
| 05/30/2023 | COT - HCBU - Roof Nailing | Passed | ||
| 06/14/2023 | COT - HCBU - Framing | Passed | 6-14-23: Rough framing of metal stud walls for offices, restrooms, and conference rooms is complete. Okay to apply drywall to one side of framing until intermediate inspection is ready. | |
| 06/21/2023 | COT - HCME - Mechanical Progress | Passed | ||
| 06/21/2023 | COT - HCME - Mechanical Intermediate | Passed | ||
| 06/21/2023 | COT - HCPL - Plumbing Progress | Passed | ||
| 06/21/2023 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 06/21/2023 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 06/21/2023 | COT - HCPL - Gas Pressure Test | Passed | ||
| 06/21/2023 | COT - HCEL - Electrical Progress | Passed | ||
| 06/27/2023 | COT - HCEL - Electrical Intermediate | Passed | ||
| 07/27/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 08/30/2023 | COT - HCBU - Building Progress | Passed | ||
| 09/08/2023 | COT - HCME - Mechanical Above Ceiling | Passed | 9/8/23 partial for all ceiling grid areas | |
| 09/08/2023 | COT - HCEL - Electrical Above Ceiling | Passed | 9/8/23 partial for all ceiling grid areas | |
| 09/28/2023 | COT - FCON - Fire - Final | Passed | ||
| 09/28/2023 | COT - HCPL - Plumbing Final | Passed | ||
| 10/02/2023 | SITE - Zoning Final | Passed | Knox switch is located at NW end of fence and fire department has passed inspection last week, walked site with Wrex from Kittle Construction and 1 native tree was removed no replaced with a 15 gallon Willow tree. I reviewed with Wrex the condition of the multiple broken curbs and wheel stops in the parking lot area and he said that is not a part of the scope of work thru Kittle Construction. |
|
| 10/02/2023 | COT - HCEL - Outdoor Lighting | Passed | ||
| 10/02/2023 | COT - HCPL - Gas Final | Passed | ||
| 10/09/2023 | COT - HCME - Mechanical Final | Passed | ||
| 10/13/2023 | COT - HCBU - Building Final | Passed | ok for C of O | |
| 10/13/2023 | COT - HCEL - Electrical Final | Passed |