Permit: T22CM06087
Permit Details
Apply Date:
08/09/2022
Applicant:
Andrea Flood
Description:
SFR F40G22 T22-M0025
Permit Reviews
Permit Number - T22CM06087
Permit Status: Issued
Permit Description: SFR F40G22 T22-M0025
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/16/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/17/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM06087
Permit Status: Issued
Permit Description: SFR F40G22 T22-M0025
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
08/09/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
Conditions
Permit Number - T22CM06087
Permit Status: Issued
Permit Description: SFR F40G22 T22-M0025
Date | Description | Comments |
---|---|---|
08/09/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
08/09/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
08/11/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE PERMIT. | |
08/11/2022 | Prior to permit issuance a General Contractor Letter (GCL) is required | |
10/17/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
10/17/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
10/17/2023 | ISSUED WITH PCRWRD CONDITIONS: NO FINAL UNTIL THE PUBLIC SEWER G-2020-053/P20WP00249 IS ACCEPTED AND RELEASED PCRWRD | |
10/17/2023 | Post-Tension Inspection Report is required. | |
10/17/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM06087
Permite Description: SFR F40G22 T22-M0025
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/03/2023 | COT - LCPL - Plumbing Intermediate | N/A | Re-inspection required | Shim mid bearing point of truss, shower vent has reverse slope at floor, located smoke det per sealed plans. |
04/03/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | Shim mid bearing point of truss, shower vent has reverse slope at floor, located smoke det per sealed plans. |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM06087
Permit Description: SFR F40G22 T22-M0025
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/14/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/14/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 09/12/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready. Valve was loose. Provide under pressure. } ; {Activity date: 09/09/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready. Canceled per contractor.} |
|
09/14/2022 | COT - RSPL - Sewer | Passed | {Activity date: 09/14/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 09/12/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready} ; {Activity date: 09/09/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready. Canceled per contractor.} | |
09/14/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/14/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 09/12/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready. Moisture near fitting.} ; {Activity date: 09/09/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready. Canceled per contractor.} | |
09/26/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 09/26/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/26/2022 | COT - RSBU - Preslab | Passed | {Activity date: 09/26/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/26/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 09/26/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/26/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 09/26/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
11/21/2022 | COT - RSBU - Roof Nailing | Passed | ||
11/21/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
04/03/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
04/03/2023 | RSME - Mechanical Progress | Passed | ||
04/03/2023 | COT - RSEL - Construction Power | Passed | ||
04/03/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
04/03/2023 | COT - LCBU - Framing | Passed | ||
04/06/2023 | COT - LCPL - Plumbing Intermediate | Passed | 4/6/2023: all corrections made | |
04/06/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 4/6/2023: all corrections made | |
04/20/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
07/14/2023 | COT - RSPL - Plumbing Final | Passed | ||
07/14/2023 | COT - BULD - SWG Clearance | Passed | ||
07/27/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
07/27/2023 | COT - RSME - Mechanical Final | Passed | ||
07/27/2023 | COT - RSEL - Electrical Final | Passed | ||
07/27/2023 | RSBU - Building Final | Passed | ||
08/10/2023 | ENGR Engineering Final | Passed |