Permit: T22CM06085
Permit Details
Apply Date:
08/09/2022
Applicant:
Denise Dunning
Description:
SFR F50B22 T22-M0032
Permit Reviews
Permit Number - T22CM06085
Permit Status: On hold
Permit Description: SFR F50B22 T22-M0032
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/09/2022 | OTHER | 08/22/2022 | COMPLETED |
04/03/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/05/2024 | APPROVED |
10/16/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/17/2023 | APPROVED |
Conditions
Permit Number - T22CM06085
Permit Status: On hold
Permit Description: SFR F50B22 T22-M0032
Date | Description | Comments |
---|---|---|
08/09/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
08/09/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
08/09/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
10/17/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
10/17/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
10/17/2023 | ISSUED WITH PCRWRD CONDITIONS: NO FINAL UNTIL THE PUBLIC SEWER G-2020-053/P20WP00249 IS ACCEPTED AND RELEASED PCRWRD | |
08/09/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. | |
10/17/2023 | Post-Tension Inspection Report is required. | |
10/17/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: On Hold
Permit Number: T22CM06085
Permite Description: SFR F50B22 T22-M0032
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/11/2023 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: On Hold
Permit Number: T22CM06085
Permit Description: SFR F50B22 T22-M0032
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/15/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/15/2022 | COT - RSPL - Sewer | Passed | {Activity date: 09/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/15/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/22/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 09/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/22/2022 | COT - RSBU - Preslab | Passed | {Activity date: 09/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/22/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 09/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/22/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 09/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
01/06/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
01/06/2023 | COT - RSBU - Roof Nailing | Passed | ||
03/09/2023 | COT - LCBU - Framing | Passed | ||
03/09/2023 | COT - RSPL - Gas Pressure Test | Passed | Approved. Holding 15 psi. 3/9/2023 | |
03/09/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
03/09/2023 | COT - RSEL - Construction Power | Passed | Clearance for TEP ECO. 3/9/2023 | |
03/09/2023 | RSME - Mechanical Progress | Passed | ||
03/13/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
04/05/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
07/11/2023 | COT - BULD - SWG Clearance | Passed | ||
08/08/2023 | COT - RSPL - Plumbing Final | Passed | ||
08/08/2023 | RSBU - Building Final | Passed | ||
08/08/2023 | COT - RSME - Mechanical Final | Passed | ||
08/08/2023 | COT - RSEL - Electrical Final | Passed | ||
08/08/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
08/08/2023 | ENGR Engineering Final | Passed |