Permit: T22CM06064
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
410 N SPRING FLOWER DR
Address NEW:
410 N SPRING FLOWER DR
Apply Date:
08/08/2022
Applicant:
Description:
SFR MER1301600 T21-M0073
Outstanding Activity Conditions
Permit Number - T22CM06064
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 08/08/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 08/08/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
| 08/08/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 08/08/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-095/P22WP00021 IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM06064
Permite Description: SFR MER1301600 T21-M0073
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSBU - Preslab | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
| 01/10/2023 | COT - HCBU - Interior Shear Bracing | N/A | Re-inspection required | fasteners can not be within 3/8” of the edge of wallboard, do not drive screws into wallboard with a hammer, shear walls not per schedule |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM06064
Permit Description: SFR MER1301600 T21-M0073
Total Completed Inspections - 24
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/07/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 10/07/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 10/17/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 10/17/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 11/15/2022 | COT - RSBU - Roof Nailing | Passed | ||
| 11/15/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 12/15/2022 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 12/15/2022 | COT - RSBU - Preslab | Passed | ||
| 12/15/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 12/15/2022 | RSME - Mechanical Progress | Passed | ||
| 12/15/2022 | COT - RSEL - Construction Power | Passed | ||
| 12/19/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 12/19/2022 | COT - RSPL - Gas Pressure Test | Passed | ||
| 12/19/2022 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 12/19/2022 | COT - LCBU - Framing | Passed | ||
| 01/11/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 03/02/2023 | COT - BULD - SWG Clearance | Passed | SWG clearance required | |
| 03/02/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 03/10/2023 | COT - RSPL - Sewer | Passed | ||
| 03/20/2023 | COT - RSEL - Electrical Final | Passed | ||
| 03/20/2023 | COT - RSME - Mechanical Final | Passed | ||
| 03/20/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 03/20/2023 | ENGR Engineering Final | Passed | SIDEWALKS AND DRIVEWAY HAVE BEEN COMPLETED IN FRONT OF THIS SITE AND HAVE NO DAMAGES NOTED DURING THIS INSPECTION. | |
| 03/20/2023 | RSBU - Building Final | Passed |