Permit: T22CM06063
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
418 N SPRING FLOWER DR
Address NEW:
418 N SPRING FLOWER DR
Apply Date:
08/08/2022
Applicant:
Description:
SFR MER1402190 T21-M0078
Outstanding Activity Conditions
Permit Number - T22CM06063
Permit Status: Issued
Permit Description: SFR MER1402190 T21-M0078
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 08/08/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 08/08/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
| 08/08/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 08/08/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-095/P22WP00021 IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM06063
Permite Description: SFR MER1402190 T21-M0078
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Preslab | N/A | Not Ready | |
| 03/20/2023 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
| 05/18/2023 | ENGR Engineering Final | N/A | Partial Pass | sidewalk in front of driveway requires correction. Exceeds 2% Cross slope |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM06063
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/07/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/03/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE} | |
| 10/07/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/03/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE Install string lines between all lots being inspected to show property pins} |
|
| 10/17/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 10/17/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 11/17/2022 | COT - RSBU - Roof Nailing | Passed | ||
| 11/22/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 01/10/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 01/10/2023 | COT - RSBU - Preslab | Passed | ||
| 01/10/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 01/10/2023 | COT - RSEL - Construction Power | Passed | ||
| 01/10/2023 | COT - LCBU - Framing | Passed | ||
| 01/10/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 01/10/2023 | RSME - Mechanical Progress | Passed | ||
| 01/10/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 02/01/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 03/22/2023 | COT - RSPL - Sewer | Passed | ||
| 03/22/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
| 05/18/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 05/18/2023 | COT - RSEL - Electrical Final | Passed | ||
| 05/18/2023 | RSBU - Building Final | Passed | ||
| 05/18/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 05/18/2023 | COT - RSME - Mechanical Final | Passed |