Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM05948
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
5660 S FLAT ROCK TR
Address NEW:
5660 S FLAT ROCK TR
Apply Date:
08/04/2022
Applicant:
Description:
SFR STF40K T20-M0039
Permit Reviews
Permit Number - T22CM05948
Permit Status: Issued
Permit Description: SFR STF40K T20-M0039
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/14/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/16/2023 | REQUIRES RESUBMIT |
| 08/22/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/25/2023 | APPROVED |
| 07/10/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/19/2023 | APPROVED |
| 10/05/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/09/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM05948
Permit Status: Issued
Permit Description: SFR STF40K T20-M0039
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 08/04/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 08/04/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
Conditions
Permit Number - T22CM05948
Permit Status: Issued
Permit Description: SFR STF40K T20-M0039
| Date | Description | Comments |
|---|---|---|
| 08/04/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/09/2023 | Post-Tension Inspection Report is required. | |
| 07/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/10/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM05948
Permite Description: SFR STF40K T20-M0039
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2023 | COT - RSEL - Construction Power | N/A | Not Ready | need weather resistant outlet |
| 06/22/2023 | COT - RSPL - Plumbing Final | N/A | Partial Pass | 6/22/23: Partial-pass. SWG Clearance for meter only. |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM05948
Permit Description: SFR STF40K T20-M0039
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/09/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
| 09/09/2022 | COT - RSPL - Sewer | Passed | {Activity date: 09/09/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
| 09/09/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/09/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved shading required.} | |
| 09/19/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 09/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 09/19/2022 | COT - RSBU - Preslab | Passed | {Activity date: 09/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 09/19/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 09/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 09/19/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 09/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 01/10/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 01/10/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 02/13/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 02/13/2023 | RSME - Mechanical Progress | Passed | ||
| 02/13/2023 | COT - LCBU - Framing | Passed | ||
| 02/13/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 02/13/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
| 03/13/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 04/25/2023 | COT - RSEL - Construction Power | Passed | ||
| 06/22/2023 | COT - BULD - SWG Clearance | Passed | 6/22/23: SWG Clearance for meter only. | |
| 07/07/2023 | COT - RSEL - Electrical Final | Passed | ||
| 07/07/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/07/2023 | RSBU - Building Final | Passed | ||
| 07/07/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 07/10/2023 | ENGR Engineering Final | Passed | ||
| 07/10/2023 | COT - RSME - Mechanical Final | Passed |