Permit: T22CM05941
Permit Details
Apply Date:
08/04/2022
Applicant:
Andrea Flood
Description:
SFR F60B22 T22-M0027
Permit Reviews
Permit Number - T22CM05941
Permit Status: Complete
Permit Description: SFR F60B22 T22-M0027
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/04/2022 | OTHER | 08/08/2022 | COMPLETED |
08/14/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/16/2023 | APPROVED |
Conditions
Permit Number - T22CM05941
Permit Status: Complete
Permit Description: SFR F60B22 T22-M0027
Date | Description | Comments |
---|---|---|
08/04/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
08/04/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
08/04/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
08/04/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM05941
Permit Description: SFR F60B22 T22-M0027
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/21/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/21/2022 | COT - RSPL - Sewer | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/21/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/29/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 09/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/29/2022 | COT - RSBU - Preslab | Passed | {Activity date: 09/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/29/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 09/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/29/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 09/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
01/17/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
01/17/2023 | COT - RSBU - Roof Nailing | Passed | ||
04/04/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
04/04/2023 | COT - LCBU - Framing | Passed | ||
04/04/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
04/04/2023 | COT - RSEL - Construction Power | Passed | TEP ECO | |
04/06/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
04/06/2023 | RSME - Mechanical Progress | Passed | ||
05/05/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
07/25/2023 | COT - BULD - SWG Clearance | Passed | SWG clearance issued | |
07/25/2023 | COT - RSPL - Plumbing Final | Passed | ||
08/15/2023 | RSBU - Building Final | Passed | ||
08/15/2023 | COT - RSME - Mechanical Final | Passed | ||
08/15/2023 | COT - FCON - Sprinkler - Final | Passed | ||
08/15/2023 | ENGR Engineering Final | Passed | ||
08/15/2023 | COT - RSEL - Electrical Final | Passed | ||
08/15/2023 | COT - RSEL - Outdoor Lighting | Passed |