Permit: T22CM05877
Permit Details
Apply Date:
08/02/2022
Applicant:
Kimber Purdum
Description:
New Car Dealership Building for Homes Tuttle Lincoln (demo of existing by separate permit)
Permit Reviews
Permit Number - T22CM05877
Permit Status: Issued
Permit Description: New Car Dealership Building for Homes Tuttle Lincoln (demo of existing by separate permit)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/02/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 09/08/2022 | COMPLETED |
09/27/2022 | RESUBMITTAL | 10/14/2022 | COMPLETED |
06/24/2023 | COMMERCIAL REVIEW - FULL v.1 | 07/07/2023 | APPROVED |
01/06/2023 | COMMERCIAL REVIEW - FULL v.1 | 01/09/2023 | APPROVED |
07/07/2023 | RESTAMP - COMMERCIAL v.1 | 07/11/2023 | APPROVED |
11/15/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/17/2023 | APPROVED |
01/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/16/2024 | APPROVED |
12/21/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/21/2023 | APPROVED |
12/05/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/06/2023 | APPROVED |
12/12/2023 | COMMERCIAL REVIEW - FULL v.1 | 12/20/2023 | APPROVED |
Conditions
Permit Number - T22CM05877
Permit Status: Issued
Permit Description: New Car Dealership Building for Homes Tuttle Lincoln (demo of existing by separate permit)
Date | Description | Comments |
---|---|---|
10/14/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
10/14/2022 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
10/14/2022 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
10/14/2022 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
10/14/2022 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
10/14/2022 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
10/14/2022 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
10/14/2022 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
10/14/2022 | SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED. | |
10/14/2022 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
10/14/2022 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
10/14/2022 | SHOP DRAWINGS REQUIRED FOR CURTAIN WALL. | |
10/14/2022 | SPECIAL INSPECTION IS REQUIRED FOR WATER CHLORINATION REPORT REQUIRED PRIOR TO FINAL INSPECTION. | |
10/14/2022 | SPECIAL INSPECTION IS REQUIRED FOR AIR BALANCE REPORT REQUIRED PRIOR TO FINAL INSPECTION. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM05877
Permite Description: New Car Dealership Building for Homes Tuttle Lincoln (demo of existing by separate permit)
Total Outstanding Inspections - 30
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/14/2022 | COT - LCME - Mechanical Final | N/A | Re-inspection required | {Activity date: 10/14/2022; Status: Prior to Final Inspectn; Inspector: DBENOIT; Comment: Entered by DBENOIT1 - AIR BALANCE REPORT REQUIRED PRIOR TO FINAL INSPECTION.} |
10/14/2022 | COT - LCPL - Plumbing Final | N/A | Re-inspection required | {Activity date: 10/14/2022; Status: Prior to Final Inspectn; Inspector: DBENOIT; Comment: Entered by DBENOIT1 - WATER CHLORINATION REPORT REQUIRED PRIOR TO FINAL INSPECTION.} |
07/07/2023 | COT - HCBU - Building Progress | N/A | Partial Pass | 7-7-23: OK to insulate deck. Walls and soffits are good. |
10/25/2023 | PDSD Building Division - Site Excavation/Layout/Rebar | N/A | Partial Pass | 10/24/23 northeast and northwest of building partition walls rebar 16 inch on center number five verticals per plan first lift OK to grout |
12/27/2023 | COT - FCON - Alarm - Final | N/A | Not Applicable | |
12/22/2023 | COT - FCON - Fire - Final | N/A | Partial Pass | Addressing needs to be displayed on building. OK to obtain TCO level 2. |
12/28/2023 | COT - HCPL - Plumbing Final | N/A | Partial Pass | |
12/28/2023 | COT - HCEL - Electrical Final | N/A | Not Ready | |
COT - HCPL - Gas Final | N/A | Scheduled | ||
12/08/2023 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 12/8/23 partial for millwork interior, and garage secondary conduits to transformer |
12/18/2023 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | 12/18/23 partial for above ceiling in back offices |
12/26/2023 | COT - HCEL - Electrical Above Ceiling | N/A | Partial Pass | 12/26/23 partial for service drive room |
COT - HCPL - Sewer | N/A | Requested | ||
COT - HCPL - Rough Soil | N/A | Requested | ||
COT - HCME - Mechanical Intermediate | N/A | Requested | ||
COT - HCBU - Roof Nailing | N/A | Requested | ||
11/28/2023 | COT - HCPL - Gas Pressure Test | N/A | Re-inspection required | 11/28/23: sediment trap needs to be properly installed |
08/01/2023 | COT - HCEL - Electrical Progress | N/A | Partial Pass | |
COT - HCEL - Grounding/Bonding | N/A | Requested | ||
09/28/2023 | COT - HCEL - Electrical Underground | N/A | Partial Pass | 9/28/23 primary UG chase from SES to transformer pad approximately 50 ft ok to cover |
COT - HCEL - Outdoor Lighting | N/A | Requested | ||
COT - HCBU - Preslab | N/A | Requested | ||
COT - HCPL - Plumbing Intermediate | N/A | Requested | ||
12/26/2023 | COT - HCME - Mechanical Above Ceiling | N/A | Partial Pass | |
COT - HCME - Mechanical Progress | N/A | Requested | ||
12/26/2023 | COT - HCPL - Plumbing Above Ceiling | N/A | Partial Pass | |
COT - HCBU - Building Above Ceiling | N/A | Scheduled | ||
COT - HCBU - Exterior Clips/Sheathing | N/A | Scheduled | ||
COT - HCBU - Interior Shear Bracing | N/A | Scheduled | ||
COT - HCBU - Masonry Pregrout | N/A | Scheduled |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM05877
Permit Description: New Car Dealership Building for Homes Tuttle Lincoln (demo of existing by separate permit)
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/15/2023 | PDSD Building Division - Site Excavation/Layout/Rebar | Passed | ||
11/17/2023 | BULD - Electrical Clearance | Passed | 660 automall drive - 2M | |
12/20/2023 | COT - HCPL - Backwater Valve | Passed | n.a | |
12/22/2023 | ENGR Engineering Final | Passed | engineering has no issues that would prevent a temporary certificate of occupancy. Complete work as discussed and schedule inspections from development package permit. |
|
12/27/2023 | COT - FCON - Fire - Final | Passed | ||
12/28/2023 | COT - HCME - Mechanical Final | Passed | ||
01/04/2024 | COT - HCPL - Plumbing Final | Passed | ||
01/04/2024 | COT - HCEL - Electrical Final | Passed | ||
02/05/2024 | COT - HCBU - Building Final | Passed | Construction is complete. Plumbing, mechanical, and electrical fixtures, outlets, and lights are installed and operational. Restrooms are properly equipped for ADA Compliance. All electrical panels in electrical equipment room are installed and properly labeled. Okay to issue permanent Certificate of Occupancy for this building. |
Scheduled Inspections
Scheduled Inspections - T22CM05877
Status: Issued
Description: New Car Dealership Building for Homes Tuttle Lincoln (demo of existing by separate permit)
Scheduled Date | Description | Entered By | Entered Date |
---|---|---|---|
11/22/2024 | COT - HCPL - Gas Final | Scheduled | |
11/22/2024 | COT - HCBU - Interior Shear Bracing | Scheduled | |
11/22/2024 | COT - HCBU - Masonry Pregrout | Scheduled | |
11/22/2024 | COT - HCBU - Framing | Scheduled | |
11/22/2024 | COT - BULD - SWG Clearance | Scheduled | |
11/22/2024 | COT - HCBU - Exterior Clips/Sheathing | Scheduled | |
11/22/2024 | COT - HCBU - Building Above Ceiling | Scheduled |