Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM05872
Permit Details
Apply Date:
08/02/2022
Applicant:
Description:
New Dumpster Enclosure at Existing Dumpster Location. This is part of a City of Tucson pilot project
Permit Reviews
Permit Number - T22CM05872
Permit Status: Complete
Permit Description: New Dumpster Enclosure at Existing Dumpster Location. This is part of a City of Tucson pilot project
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/02/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 09/01/2022 | COMPLETED |
09/09/2022 | RESUBMITTAL | 09/19/2022 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T22CM05872
Permit Status: Complete
Permit Description: New Dumpster Enclosure at Existing Dumpster Location. This is part of a City of Tucson pilot project
Total Outstanding Activity Conditions - 8
Date | Name |
---|---|
08/02/2022 | CONTRACTOR LETTER REQUIRED PRIOR TO ISSUANCE |
08/31/2022 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. |
08/31/2022 | SPECIAL INSPECTION FOR REINFORCING STEEL |
08/31/2022 | SPECIAL INSPECTION IS REQUIRED FOR MATERIALS TESTING - BYBLOCK SYSTEM. |
08/31/2022 | SPECIAL INSPECTION IS REQUIRED FOR SOILS . |
08/31/2022 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED (IF USED). |
08/31/2022 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED (IF USED). |
08/31/2022 | SPECIAL INSPECTION IS REQUIRED FOR POST TENSIONING OF THREADED RODS (SPECIAL CASE) . |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM05872
Permit Description: New Dumpster Enclosure at Existing Dumpster Location. This is part of a City of Tucson pilot project
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/06/2022 | COT - LCBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/06/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/29/2022; Status: Partial Approval; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Partial. Okay to pour footings only on three gate post columns.} | |
10/06/2022 | COT - LCBU - Preslab | Passed | {Activity date: 10/06/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved} | |
10/19/2022 | COT - LCBU - Framing | Passed | {Activity date: 10/19/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
02/07/2023 | COT - LCBU - Building Final | Passed |