Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM05867
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1700 E 9TH ST
Address NEW:
1700 E 9TH ST
Apply Date:
08/02/2022
Applicant:
Aaron Neymer
Description:
Unit #2 Expansion of Two Bedrooms and Bathroom Addition
Permit Reviews
Permit Number - T22CM05867
Permit Status: Complete
Permit Description: Unit #2 Expansion of Two Bedrooms and Bathroom Addition
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/02/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 08/09/2022 | COMPLETED |
| 05/02/2023 | RESIDENTIAL NEW DWELLING v.3 | 05/15/2023 | REQUIRES RESUBMIT |
| 07/06/2023 | RESIDENTIAL NEW DWELLING v.4 | 07/12/2023 | APPROVED |
| 01/23/2023 | RESIDENTIAL NEW DWELLING v.1 | 02/16/2023 | REQUIRES RESUBMIT |
| 03/23/2023 | RESIDENTIAL NEW DWELLING v.2 | 04/20/2023 | REQUIRES RESUBMIT |
| 07/12/2023 | RESTAMP - RESIDENTIAL v.1 | 07/12/2023 | APPROVED |
Conditions
Permit Number - T22CM05867
Permit Status: Complete
Permit Description: Unit #2 Expansion of Two Bedrooms and Bathroom Addition
| Date | Description | Comments |
|---|---|---|
| 07/13/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM05867
Permite Description: Unit #2 Expansion of Two Bedrooms and Bathroom Addition
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/28/2024 | RSBU - Building Final | N/A | Re-inspection required | 6/28/24: missing landing at exterior door. Hammer arrestors needed at washer connection. Hot/ neutral reversed at laundry room. Toilet not caulked in main bathroom. Need ladder for roof inspection. Label main panel area specific for addition. |
| 06/28/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 6/28/24: missing landing at exterior door. Hammer arrestors needed at washer connection. Hot/ neutral reversed at laundry room. Toilet not caulked in main bathroom. Need ladder for roof inspection. Label main panel area specific for addition. |
| 06/28/2024 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 6/28/24: missing landing at exterior door. Hammer arrestors needed at washer connection. Hot/ neutral reversed at laundry room. Toilet not caulked in main bathroom. Need ladder for roof inspection. Label main panel area specific for addition. |
| 06/28/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 6/28/24: missing landing at exterior door. Hammer arrestors needed at washer connection. Hot/ neutral reversed at laundry room. Toilet not caulked in main bathroom. Need ladder for roof inspection. Label main panel area specific for addition. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM05867
Permit Description: Unit #2 Expansion of Two Bedrooms and Bathroom Addition
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2023 | COT - RSBU - Preslab | Passed | ||
| 08/25/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 12/14/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 02/14/2024 | BULD - Electrical Clearance | Passed | Electrical panel is properly installed and secured to exterior wall. ECO Clearance issued for TEP to energize the electrical panel. | |
| 02/14/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Exterior shear plywood is properly installed and nailed off. H2.5 clips are installed on every truss and roof sheathing is installed and properly secured per plans. | |
| 02/14/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to install insulation and drywall on walls and ceilings. | |
| 07/12/2024 | RSBU - Building Final | Passed | ||
| 07/12/2024 | COT - RSEL - Electrical Final | Passed | ||
| 07/12/2024 | COT - RSME - Mechanical Final | Passed | ||
| 07/12/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 08/23/2024 | COT - RSPL - Rough Soil | Passed |