Permit: T22CM05856
Permit Details
Apply Date:
08/01/2022
Applicant:
Annette Suarez
Description:
Construction of a 381 s.f. bike repair & dog wash.
Permit Reviews
Permit Number - T22CM05856
Permit Status: Fees due
Permit Description: Construction of a 381 s.f. bike repair & dog wash.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/01/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 09/08/2022 | COMPLETED |
02/22/2024 | RESTAMP - COMMERCIAL v.1 | 03/01/2024 | APPROVED |
11/08/2022 | COMMERCIAL REVIEW - FULL v.1 | 12/15/2022 | REQUIRES RESUBMIT |
02/14/2024 | COMMERCIAL REVIEW - FULL v.3 | 02/15/2024 | APPROVED |
02/15/2023 | COMMERCIAL REVIEW - FULL v.2 | 03/14/2023 | REQUIRES RESUBMIT |
02/15/2024 | RESTAMP - COMMERCIAL v.1 | 02/22/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM05856
Permit Status: Fees due
Permit Description: Construction of a 381 s.f. bike repair & dog wash.
Total Outstanding Activity Conditions - 12
Date | Name |
---|---|
03/01/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
03/13/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. |
03/13/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
03/13/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
03/13/2023 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. |
03/13/2023 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
03/13/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
03/13/2023 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |
03/13/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
03/13/2023 | WATER STERILIZATION REPORT IS REQUIRED. |
08/01/2022 | CONTRACTOR LETTER REQUIRED PRIOR TO ISSUANCE |
09/17/2022 | ISSUED WITH PCRWRD & PDEQ CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL PDEQ ISSUES A DISHARGE AUTHORIZATION FOR THE PRIVATE SEWER #P22SD00077 NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PUBLIC SEWER G-2022-059(P22WI00029/P22SD00084) IS ACCEPTED AND RELEASED BY PCRWRD |
Conditions
Permit Number - T22CM05856
Permit Status: Fees due
Permit Description: Construction of a 381 s.f. bike repair & dog wash.
Date | Description | Comments |
---|---|---|
09/17/2022 | NEED WASTE WATER RECEIPT? | |
01/11/2023 | Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection. |