Permit: T22CM05846
Permit Details
Apply Date:
08/01/2022
Applicant:
Andrea Flood
Description:
SFR F60A22 T22-M0028
Permit Reviews
Permit Number - T22CM05846
Permit Status: Complete
Permit Description: SFR F60A22 T22-M0028
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/01/2022 | OTHER | 08/08/2022 | COMPLETED |
Conditions
Permit Number - T22CM05846
Permit Status: Complete
Permit Description: SFR F60A22 T22-M0028
Date | Description | Comments |
---|---|---|
08/01/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
08/01/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
08/01/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
08/01/2022 | Wastewater Utility Permit # P22wx01626 (No Restrictions) |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM05846
Permite Description: SFR F60A22 T22-M0028
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/22/2023 | COT - HCBU - Interior Shear Bracing | N/A | Not Ready | missing screws in multiple areas throughout the house in fields and above ceiling. replace drywall screws in shower with non corrosive screws. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM05846
Permit Description: SFR F60A22 T22-M0028
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/21/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/21/2022 | COT - RSPL - Sewer | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/21/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/29/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 09/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/29/2022 | COT - RSBU - Preslab | Passed | {Activity date: 09/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/29/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 09/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/29/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 09/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
11/22/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
11/23/2022 | COT - RSBU - Roof Nailing | Passed | ||
02/01/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
02/01/2023 | COT - RSEL - Construction Power | Passed | TEP ECO | |
02/01/2023 | COT - LCBU - Framing | Passed | ||
02/01/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
02/01/2023 | RSME - Mechanical Progress | Passed | ||
02/01/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
02/24/2023 | COT - HCBU - Interior Shear Bracing | Passed | corrections were made | |
05/15/2023 | COT - RSPL - Plumbing Final | Passed | ||
05/15/2023 | COT - BULD - SWG Clearance | Passed | SWG clearance issued | |
06/13/2023 | RSBU - Building Final | Passed | ||
06/13/2023 | COT - RSME - Mechanical Final | Passed | ||
06/13/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
06/13/2023 | ENGR Engineering Final | Passed | ||
06/13/2023 | COT - RSEL - Electrical Final | Passed |