Permit: T22CM05817
Permit Details
Apply Date:
07/29/2022
Applicant:
Andrea Flood
Description:
SFR F40F22 T22-M0026
Permit Reviews
Permit Number - T22CM05817
Permit Status: Complete
Permit Description: SFR F40F22 T22-M0026
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/15/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/18/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM05817
Permit Status: Complete
Permit Description: SFR F40F22 T22-M0026
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
07/29/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
07/29/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
Conditions
Permit Number - T22CM05817
Permit Status: Complete
Permit Description: SFR F40F22 T22-M0026
Date | Description | Comments |
---|---|---|
07/29/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM05817
Permite Description: SFR F40F22 T22-M0026
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSBU - Roof Nailing | N/A | Not Ready | |
10/26/2022 | COT - RSBU - Exterior Clips/Sheathing | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM05817
Permit Description: SFR F40F22 T22-M0026
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/07/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/07/2022 | COT - RSPL - Sewer | Passed | {Activity date: 09/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/07/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/16/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 09/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/16/2022 | COT - RSBU - Preslab | Passed | {Activity date: 09/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/16/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 09/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/16/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 09/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
01/20/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
01/20/2023 | RSME - Mechanical Progress | Passed | ||
01/20/2023 | COT - RSEL - Construction Power | Passed | ||
01/20/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
01/20/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
01/20/2023 | COT - LCBU - Framing | Passed | ||
01/20/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
02/03/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
06/09/2023 | COT - RSPL - Plumbing Final | Passed | 6/9/23: SWG Tag Clearance | |
06/14/2023 | COT - RSME - Mechanical Final | Passed | ||
06/14/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
06/14/2023 | ENGR Engineering Final | Passed | ||
06/29/2023 | COT - RSEL - Electrical Final | Passed | ||
06/29/2023 | RSBU - Building Final | Passed |