Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
07/29/2022
Applicant:
Description:
SFR 230.2380 T21-M0028

Outstanding Activity Conditions

Permit Number - T22CM05815
Permit Status: Issued
Permit Description: SFR 230.2380 T21-M0028
Total Outstanding Activity Conditions - 4
Date Name
07/29/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
07/29/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
07/29/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/29/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2020-100/P21WP00059, G-20-059/P20WP00060, G-20-089/P20WP00061 AND THE DOWNSTREAM OFFSITEPUBLIC SEWER FOR PARCEL 4 G-2020-087 IS ACCEPTED AND RELEASED BY PCRWRD

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM05815
Permite Description: SFR 230.2380 T21-M0028
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
06/12/2023 COT - RSPL - Plumbing Final N/A Re-inspection required 6-12-23: wanted SWG clearance; need cap on b vent.

Completed Inspections

Permit Status: Issued
Permit Number: T22CM05815
Permit Description: SFR 230.2380 T21-M0028
Total Completed Inspections - 23
Date Description Inspector Results Comments
01/19/2023 COT - RSPL - Rough Soil Passed
01/19/2023 COT - RSPL - Yard Water Line Passed
01/27/2023 COT - RSBU - Preslab Passed
01/27/2023 COT - RSEL - Grounding/Bonding Passed
01/27/2023 COT - RSEL - Electrical Underground Passed
01/27/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
02/08/2023 COT - RSBU - Roof Nailing Passed
02/09/2023 COT - LCBU - Framing Passed
02/09/2023 COT - RSBU - Exterior Clips/Sheathing Passed
03/17/2023 COT - RSPL - Gas Pressure Test Passed
03/17/2023 COT - LCPL - Plumbing Intermediate Passed
03/17/2023 RSME - Mechanical Progress Passed
03/17/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/27/2023 COT - RSPL - Sewer Passed
04/14/2023 COT - RSEL - Construction Power Passed TEP ECO
04/19/2023 COT - HCBU - Interior Shear Bracing Passed 4-19-23: Shear wall at top of stairs is properly screwed off.
06/15/2023 COT - BULD - SWG Clearance Passed
07/14/2023 COT - RSPL - Plumbing Final Passed
07/14/2023 COT - RSME - Mechanical Final Passed
07/14/2023 COT - RSEL - Outdoor Lighting Passed
07/14/2023 COT - RSEL - Electrical Final Passed
07/14/2023 RSBU - Building Final Passed
07/17/2023 ENGR Engineering Final Passed