Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
07/28/2022
Applicant:
Description:
SFR 130.1600 T21-M0030

Outstanding Activity Conditions

Permit Number - T22CM05771
Permit Status: Issued
Permit Description: SFR 130.1600 T21-M0030
Total Outstanding Activity Conditions - 4
Date Name
07/28/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
07/28/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
07/28/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/28/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2020-100/P21WP00059, G-20-059/P20WP00060, G-20-089/P20WP00061 AND THE DOWNSTREAM OFFSITEPUBLIC SEWER FOR PARCEL 4 G-2020-087 IS ACCEPTED AND RELEASED BY PCRWRD

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM05771
Permite Description: SFR 130.1600 T21-M0030
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
11/23/2022 COT - RSBU - Preslab N/A Canceled canceled per contractor
11/23/2022 COT - RSBU - Excavation/Rebar/Zoning N/A Canceled canceled per contractor
11/23/2022 COT - RSEL - Electrical Underground N/A Canceled canceled per contractor
11/23/2022 COT - RSEL - Grounding/Bonding N/A Canceled canceled per contractor
06/12/2023 COT - RSPL - Plumbing Final N/A Re-inspection required 6-12-23: wanted SWG clearance; need cap on b vent.

Completed Inspections

Permit Status: Issued
Permit Number: T22CM05771
Permit Description: SFR 130.1600 T21-M0030
Total Completed Inspections - 23
Date Description Inspector Results Comments
11/15/2022 COT - RSPL - Rough Soil Passed shading required. okay to backfill.
11/28/2022 COT - RSBU - Preslab Passed
11/28/2022 COT - RSBU - Excavation/Rebar/Zoning Passed
11/28/2022 COT - RSEL - Electrical Underground Passed
11/28/2022 COT - RSEL - Grounding/Bonding Passed
01/06/2023 COT - RSBU - Exterior Clips/Sheathing Passed
01/06/2023 COT - LCBU - Framing Passed
03/03/2023 COT - RSEL - Construction Power Passed TEP ECO
03/15/2023 COT - RSBU - Roof Nailing Passed
03/15/2023 COT - RSPL - Gas Pressure Test Passed
03/15/2023 RSME - Mechanical Progress Passed
03/17/2023 COT - LCPL - Plumbing Intermediate Passed
03/17/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/23/2023 COT - RSPL - Sewer Passed
04/07/2023 COT - HCBU - Interior Shear Bracing Passed 4/7/2023: all corrections made
06/15/2023 COT - BULD - SWG Clearance Passed
06/22/2023 COT - RSPL - Plumbing Final Passed
06/22/2023 COT - RSEL - Electrical Final Passed
06/22/2023 COT - RSPL - Yard Water Line Passed
06/22/2023 RSBU - Building Final Passed
06/22/2023 ENGR Engineering Final Passed
06/22/2023 COT - RSEL - Outdoor Lighting Passed
06/26/2023 COT - RSME - Mechanical Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW