Permit: T22CM05750
Permit Details
Apply Date:
07/28/2022
Applicant:
Description:
SFR LE23001 T22-M0058
Outstanding Activity Conditions
Permit Number - T22CM05750
Permit Status: Issued
Permit Description: SFR LE23001 T22-M0058
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
07/13/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
07/13/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
07/28/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
07/28/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
07/28/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - T22CM05750
Permit Status: Issued
Permit Description: SFR LE23001 T22-M0058
Date | Description | Comments |
---|---|---|
07/28/2022 | NO FINAL UNTIL THE PUBLIC OFFSITE SEWERG-2020-058/P21WP00065 FOR PARCEL 3, THE PUBLIC OFFSITE SEWER G-2020-101/P21WP00064 FORPARCEL 4, AND THE PUBLIC SEWER G-2020-090/P21WP00062 FOR PARCEL 5, IS ACCEPTED ANDRELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM05750
Permite Description: SFR LE23001 T22-M0058
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
10/27/2022 | ENGR Engineering Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM05750
Permit Description: SFR LE23001 T22-M0058
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/21/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved} | |
09/21/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved. Shading required.} | |
10/07/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - approved} | |
10/07/2022 | COT - RSBU - Preslab | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - approved} | |
10/07/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - approved} | |
10/07/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - approved} | |
11/18/2022 | COT - RSBU - Roof Nailing | Passed | ||
11/18/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
02/14/2023 | RSME - Mechanical Progress | Passed | ||
02/14/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
02/14/2023 | COT - LCBU - Framing | Passed | ||
02/16/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
02/16/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
02/27/2023 | COT - RSPL - Sewer | Passed | okay to backfill. shading required | |
02/27/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
04/07/2023 | COT - RSEL - Construction Power | Passed | TEP ECO | |
05/10/2023 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
05/25/2023 | COT - RSPL - Plumbing Final | Passed | 5-25-24: Need sewer sign off. Ok to sign off in office when cleared. | |
05/25/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
05/25/2023 | COT - RSME - Mechanical Final | Passed | ||
05/25/2023 | COT - RSEL - Electrical Final | Passed | ||
05/26/2023 | ENGR Engineering Final | Passed | MISSING SIDEWALK ALONG THE WEST SIDE OF THE PROPERTY IN THE RIGHT OF WAY, AND MINOR CLEANUP AND BACKFILL IN THE REAR YARD TO BE ADDRESSED BY THE DEVELOPER | |
05/30/2023 | RSBU - Building Final | Passed | 5/30/23: Thermostat moved to appropriate height |