Permit: T22CM05730
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
802 E 38TH ST
Address NEW:
802 E 38TH ST
Apply Date:
07/28/2022
Applicant:
Description:
R - Installation of a 10.120kW dc system
Permit Reviews
Permit Number - T22CM05730
Permit Status: Issued
Permit Description: R - Installation of a 10.120kW dc system
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/28/2022 | OTHER | 09/23/2022 | COMPLETED |
| 12/23/2022 | RESIDENTIAL SOLAR v.1 | 01/23/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM05730
Permit Status: Issued
Permit Description: R - Installation of a 10.120kW dc system
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 07/30/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 10/04/2022 | FUP T22OT00701 MUST BE PAID BEFORE FINAL INSPECTION |
Conditions
Permit Number - T22CM05730
Permit Status: Issued
Permit Description: R - Installation of a 10.120kW dc system
| Date | Description | Comments |
|---|---|---|
| 07/28/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM05730
Permite Description: R - Installation of a 10.120kW dc system
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2023 | BULD - Electrical Clearance | N/A | Canceled | No access to equipment (dogs) |
| 02/27/2023 | COT - RSEL - Electrical Final | N/A | Canceled | |
| 02/27/2023 | RSBU - Building Final | N/A | Canceled |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM05730
Permit Description: R - Installation of a 10.120kW dc system
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/03/2023 | COT - RSEL - Electrical Final | Passed | 3-3-23: DGC clearance. | |
| 03/03/2023 | RSBU - Building Final | Passed |