Permit: T22CM05723
Permit Details
Apply Date:
07/27/2022
Applicant:
Description:
SFR LE23004 T22-M0055
Permit Reviews
Permit Number - T22CM05723
Permit Status: Issued
Permit Description: SFR LE23004 T22-M0055
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/27/2022 | REVISION - - 1ST | 10/03/2022 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T22CM05723
Permit Status: Issued
Permit Description: SFR LE23004 T22-M0055
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
07/10/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
07/10/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - T22CM05723
Permit Status: Issued
Permit Description: SFR LE23004 T22-M0055
Date | Description | Comments |
---|---|---|
07/27/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
07/27/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
07/27/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
07/27/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-098/P22WP00026 IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM05723
Permite Description: SFR LE23004 T22-M0055
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/03/2022 | COT - LCPL - Plumbing Intermediate | N/A | Canceled | {Activity date: 10/03/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
10/03/2022 | RSME - Mechanical Progress | N/A | Canceled | {Activity date: 10/03/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
10/26/2022 | COT - RSBU - Roof Nailing | N/A | Not Ready | |
10/26/2022 | COT - RSPL - Sewer | N/A | Not Ready | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM05723
Permit Description: SFR LE23004 T22-M0055
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/28/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/28/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} | |
09/28/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/28/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved. Shading required.} | |
10/05/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/05/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} | |
10/05/2022 | COT - RSBU - Preslab | Passed | {Activity date: 10/05/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} | |
10/05/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/05/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} | |
10/05/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/05/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} | |
11/21/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
11/21/2022 | COT - RSPL - Sewer | Passed | ||
12/12/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
12/12/2022 | COT - LCBU - Framing | Passed | ||
12/12/2022 | COT - RSPL - Gas Pressure Test | Passed | holding 15 psi | |
12/14/2022 | COT - RSEL - Construction Power | Passed | clearance for TEP ECO. | |
12/28/2022 | COT - HCBU - Interior Shear Bracing | Passed | ||
03/08/2023 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. | |
03/13/2023 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
03/29/2023 | RSBU - Building Final | Passed | ||
03/29/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
03/29/2023 | COT - RSEL - Electrical Final | Passed | ||
03/29/2023 | ENGR Engineering Final | Passed | ||
03/29/2023 | COT - RSME - Mechanical Final | Passed | ||
03/30/2023 | COT - RSPL - Plumbing Final | Passed | 3/30/2023 : all corrections made |