Permit: T22CM05709
Permit Details
Status:
Expired
Type:
Residential Building - One or Two Family
Address:
2340 E DRACHMAN ST 2
Address NEW:
2340 E DRACHMAN ST 2
Apply Date:
07/27/2022
Applicant:
alex enoch
Description:
ADU
Permit Reviews
Permit Number - T22CM05709
Permit Status: Expired
Permit Description: ADU
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/27/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 08/26/2022 | COMPLETED |
| 10/04/2022 | RESUBMITTAL | 10/06/2022 | COMPLETED |
| 05/04/2023 | RESIDENTIAL NEW DWELLING v.1 | 06/08/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM05709
Permit Status: Expired
Permit Description: ADU
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 06/08/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 08/04/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
| 09/07/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
| 09/07/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
| 10/06/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm |
Outstanding Inspections
Permit Status: Expired
Permit Number: T22CM05709
Permite Description: ADU
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/04/2022 | COT - LCPL - Plumbing Intermediate | N/A | Canceled | {Activity date: 08/04/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
| 08/04/2022 | RSME - Mechanical Progress | N/A | Canceled | {Activity date: 08/04/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
| 10/26/2022 | COT - RSPL - Rough Soil | N/A | Not Ready | |
| 10/27/2023 | COT - RSME - Mechanical Final | N/A | Re-inspection required | Called received no answer. Got to the site no answer as well. Need access to the site. 10/27/2023 |
| 10/27/2023 | RSBU - Building Final | N/A | Re-inspection required | Called received no answer. Got to the site no answer as well. Need access to the site. 10/27/2023 |
| 10/27/2023 | COT - RSEL - Outdoor Lighting | N/A | Re-inspection required | Called received no answer. Got to the site no answer as well. Need access to the site. 10/27/2023 |
| 10/27/2023 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | Called received no answer. Got to the site no answer as well. Need access to the site. 10/27/2023 |
| 10/27/2023 | COT - RSEL - Electrical Final | N/A | Re-inspection required | Called received no answer. Got to the site no answer as well. Need access to the site. 10/27/2023 |
Completed Inspections
Permit Status: Expired
Permit Number: T22CM05709
Permit Description: ADU
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/13/2023 | COT - RSPL - Rough Soil | Passed | Looked at setbacks. | |
| 04/18/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 04/18/2023 | COT - RSBU - Preslab | Passed | Okay for concrete placement in slab. 4/18/2023 | |
| 04/18/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Okay for concrete in footings. 4/18/2023 | |
| 05/19/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 05/30/2023 | COT - LCBU - Framing | Passed | ||
| 07/07/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 07/24/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to insulate, drywall, and texture all interior walls and ceilings. | |
| 09/06/2023 | BULD - Electrical Clearance | Passed | TEP ECO for unit 2 TEP INCR for unit 1 |
|
| 09/06/2023 | COT - RSEL - Construction Power | Passed | TEP ECO | |
| 10/27/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Duplicate inspection. 10/27/2023 | |
| 10/27/2023 | COT - RSPL - Sewer | Passed | Duplicate inspection. 10/27/2023 | |
| 10/31/2023 | COT - RSME - Mechanical Final | Passed | ||
| 10/31/2023 | RSBU - Building Final | Passed | ||
| 10/31/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 10/31/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 10/31/2023 | COT - RSEL - Electrical Final | Passed |