Permit: T22CM05681
Permit Details
Apply Date:
07/26/2022
Applicant:
Andrea Flood
Description:
SFR F50E22 T22-M0029
Permit Reviews
Permit Number - T22CM05681
Permit Status: Complete
Permit Description: SFR F50E22 T22-M0029
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/26/2022 | OTHER | 08/08/2022 | COMPLETED |
08/14/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/16/2023 | APPROVED |
Conditions
Permit Number - T22CM05681
Permit Status: Complete
Permit Description: SFR F50E22 T22-M0029
Date | Description | Comments |
---|---|---|
07/26/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
07/26/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
07/26/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
08/08/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM05681
Permite Description: SFR F50E22 T22-M0029
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/07/2023 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | Provide DWV test. Add nail plates that are within an 1 1/4 from edges. Secure pex lines. Need 30” of work space near condenser unit. |
10/27/2022 | COT - LCBU - Framing | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM05681
Permit Description: SFR F50E22 T22-M0029
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/21/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/21/2022 | COT - RSPL - Sewer | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/21/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/30/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 09/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/30/2022 | COT - RSBU - Preslab | Passed | {Activity date: 09/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/30/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 09/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/30/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 09/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
11/21/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
11/21/2022 | COT - RSBU - Roof Nailing | Passed | ||
03/07/2023 | RSME - Mechanical Progress | Passed | ||
03/07/2023 | COT - RSEL - Construction Power | Passed | clearance for TEP ECO. | |
03/09/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
03/24/2023 | COT - LCPL - Plumbing Intermediate | Passed | Corrections were made 3/23/2023 | |
03/24/2023 | COT - LCBU - Framing | Passed | Corrections were made 3/23/2023 | |
03/24/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made 3/23/2023 | |
05/01/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
08/02/2023 | COT - BULD - SWG Clearance | Passed | SWG clearance issued | |
08/02/2023 | COT - RSPL - Plumbing Final | Passed | ||
08/15/2023 | COT - RSEL - Electrical Final | Passed | ||
08/15/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
08/15/2023 | COT - RSME - Mechanical Final | Passed | ||
08/15/2023 | RSBU - Building Final | Passed | ||
08/15/2023 | COT - FCON - Sprinkler - Final | Passed | ||
08/15/2023 | ENGR Engineering Final | Passed |