Permit: T22CM05663
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
511 N CARIBE AV
Address NEW:
511 N CARIBE AV
Apply Date:
07/26/2022
Applicant:
Description:
R - Installation of a 10.40 kw PV System
Permit Reviews
Permit Number - T22CM05663
Permit Status: Issued
Permit Description: R - Installation of a 10.40 kw PV System
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/26/2022 | OTHER | 08/30/2022 | COMPLETED |
| 09/22/2022 | REVISION - - 1ST | 10/20/2022 | ACTIVE |
| 11/09/2022 | RESIDENTIAL SOLAR v.1 | 11/09/2022 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM05663
Permit Status: Issued
Permit Description: R - Installation of a 10.40 kw PV System
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 07/29/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Conditions
Permit Number - T22CM05663
Permit Status: Issued
Permit Description: R - Installation of a 10.40 kw PV System
| Date | Description | Comments |
|---|---|---|
| 07/26/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM05663
Permite Description: R - Installation of a 10.40 kw PV System
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/06/2022 | RSBU - Building Final | N/A | Re-inspection required | field tech performing the video inspection appears to be inexperienced with electrical system. Inspection canceled. |
| 12/06/2022 | COT - RSEL - Electrical Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM05663
Permit Description: R - Installation of a 10.40 kw PV System
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2022 | RSBU - Building Final | Passed | SOLAR | |
| 12/12/2022 | BULD - Electrical Clearance | Passed | Approved, DGC to TEP is required | |
| 12/12/2022 | COT - RSEL - Electrical Final | Passed |