Permit: T22CM05650
Permit Details
Apply Date:
07/25/2022
Applicant:
Description:
HVAC replacement on main church
Permit Reviews
Permit Number - T22CM05650
Permit Status: Complete
Permit Description: HVAC replacement on main church
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/25/2022 | 3RD PARTY REVIEW - COMMERCIAL TI | 09/02/2022 | COMPLETED |
Conditions
Permit Number - T22CM05650
Permit Status: Complete
Permit Description: HVAC replacement on main church
Date | Description | Comments |
---|---|---|
09/01/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
07/25/2022 | Prior to permit issuance a General Contractor Letter (GCL) is required |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM05650
Permite Description: HVAC replacement on main church
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/08/2022 | COT - LCBU - Framing | N/A | Not Applicable | |
01/24/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Applicable | |
01/24/2023 | COT - HCBU - Exterior Clips/Sheathing | N/A | Not Applicable | |
01/31/2023 | COT - LCPL - Plumbing Above Ceiling | N/A | Not Applicable | N/A |
01/31/2023 | COT - LCME - Mechanical Above Ceiling | N/A | Not Applicable | N/A |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM05650
Permit Description: HVAC replacement on main church
Total Completed Inspections - 10
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/31/2023 | COT - LCME - Mechanical Intermediate | Passed | ||
01/31/2023 | COT - LCPL - Plumbing Final | Passed | ||
02/03/2023 | COT - LCEL - Electrical Underground | Passed | 3” ug conduit in mechanical yard | |
02/06/2023 | COT - LCEL - Electrical Final | Passed | ||
02/06/2023 | COT - LCME - Mechanical Final | Passed | SWG clearance for two 10 ton roof AC units and one 5 ton unit | |
02/06/2023 | COT - LCEL - Electrical Intermediate | Passed | ||
02/13/2023 | COT - LCBU - Building Final | Passed | All construction is complete. | |
02/13/2023 | COT - BULD - SWG Clearance | Passed | Not required for this project. gas line is connected to the church side of the meter. | |
02/13/2023 | COT - LCPL - Gas Pressure Test | Passed | gas lines are connected to meter and functional. | |
02/13/2023 | COT - LCEL - Electrical Above Ceiling | Passed | all construction is completed |