Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
07/25/2022
Applicant:
Richard Lombardo
Description:
Enclose Covered Patio

Permit Reviews

Permit Number - T22CM05646
Permit Status: Issued
Permit Description: Enclose Covered Patio
Start Date Submittal Complete Date Status  
07/25/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 08/16/2022 COMPLETED Review Details

Conditions

Permit Number - T22CM05646
Permit Status: Issued
Permit Description: Enclose Covered Patio
Date Description Comments
08/16/2022 General Contractor Letter (GCL) or Owner/Builder Waiver required prior to permit issuance

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM05646
Permite Description: Enclose Covered Patio
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
08/03/2022 RSME - Mechanical Progress N/A Canceled {Activity date: 08/03/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
10/27/2022 COT - RSME - Mechanical Final N/A Not Ready
10/26/2022 COT - RSEL - Service Upgrade N/A Not Ready
10/26/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready
10/27/2022 COT - LCBU - Framing N/A Not Ready
03/17/2023 COT - RSEL - Electrical Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM05646
Permit Description: Enclose Covered Patio
Total Completed Inspections - 5
Date Description Inspector Results Comments
01/13/2023 COT - RSBU - Exterior Clips/Sheathing Passed
01/13/2023 COT - RSBU - Preslab Passed small footings were per plan. work was completed already, seen a video of the footing on homeowners phone.
03/17/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/17/2023 COT - LCBU - Framing Passed
09/19/2023 RSBU - Building Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
OBW 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
OBW.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW