Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3250 N STONE AV
Apply Date:
07/21/2022
Applicant:
Jesus Florez
Description:
Duplex and Attached Sleeping Quarters

Permit Reviews

Permit Number - T22CM05551
Permit Status: Complete
Permit Description: Duplex and Attached Sleeping Quarters
Start Date Submittal Complete Date Status  
07/21/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 08/17/2022 COMPLETED Review Details
09/07/2022 RESUBMITTAL 09/29/2022 COMPLETED Review Details
10/03/2022 RESUBMITTAL 10/04/2022 COMPLETED Review Details
05/05/2023 RESTAMP - RESIDENTIAL v.1 05/09/2023 APPROVED Review Details
02/03/2023 RESIDENTIAL NEW DWELLING v.1 02/10/2023 REQUIRES RESUBMIT Review Details
04/27/2023 RESIDENTIAL NEW DWELLING v.4 04/27/2023 REQUIRES RESUBMIT Review Details
03/21/2023 RESIDENTIAL NEW DWELLING v.3 04/19/2023 REQUIRES RESUBMIT Review Details
03/03/2023 RESIDENTIAL NEW DWELLING v.2 03/07/2023 REQUIRES RESUBMIT Review Details
05/02/2023 RESIDENTIAL NEW DWELLING v.5 05/05/2023 APPROVED Review Details

Conditions

Permit Number - T22CM05551
Permit Status: Complete
Permit Description: Duplex and Attached Sleeping Quarters
Date Description Comments
07/25/2022 SPECIAL INSPECTION IS REQ'D FOR AN ELEVATION CERTIFICATE.THE ELEVATION OF THE FORMED PRE-SLAB MUST BE SUBMITTED ON AN ELEVATION CERTIFICATE AND SEALED BY A REGISTERED LAND SURVEYOR. FAX OR EMAIL ELEVATION CERTIFICATE TO: ATTENTION LOREN MAKUS. FAX: 879-8010, EMAIL: LOREN.MAKUS@TUCSONAZ.GOV. THIS CONDITION APPLIES TO INSPECTION 1015 AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927.
05/10/2023 Contractor's active Arizona Contractor's License number for specified scope of work required prior to issuance of permit. , or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit.
06/14/2024 FINAL ELEVATION CERTIFICATE REQUIRED: AN ORIGINAL FINAL ELEVATION CERTIFICATE SEALED BY A REGISTERED LAND SURVEYOR IS REQ'D. MAIL ELEVATION CERTIFICATE TO: CITY OF TUCSON, PLANNING & DEVELOPMENT SERVICES DEPT, ATTN: LOREN MAKUS, P.O. BOX 27210, TUCSON, AZ 85726-7210 OR DELIVER IT TO THE 1ST FL NORTH SIDE OF 201 N. STONE AVE. THIS CONDITION APPLIES TO ALL FINAL INSPECTIONS (1090, 2090, 3090, 4090) AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927.
05/05/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM05551
Permite Description: Duplex and Attached Sleeping Quarters
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
09/08/2022 COT - LCPL - Plumbing Intermediate N/A Canceled {Activity date: 09/08/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
09/08/2022 RSME - Mechanical Progress N/A Canceled {Activity date: 09/08/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
01/29/2024 RSBU - Building Final N/A Partial Pass Partial pass on building final. Interior needs to be cleaned of dirt, mud, and other construction debris. Exterior wood porches need to be stained and/or painted, and safety railing needs installed on all porches.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM05551
Permit Description: Duplex and Attached Sleeping Quarters
Total Completed Inspections - 19
Date Description Inspector Results Comments
06/09/2023 COT - RSBU - Excavation/Rebar/Zoning Passed 6-9-23: Rebar placement is per plans for stem walls. Okay for concrete placement in stem walls.
06/09/2023 COT - RSBU - Stem Wall/Retaining Wall Passed 6-9-23: Rebar placement is per plans for stem walls. Okay for concrete placement in stem walls.
07/25/2023 COT - RSPL - Rough Soil Passed
08/15/2023 COT - RSBU - Preslab Passed Okay for concrete placement in slab. 8/15/2023
08/31/2023 COT - RSBU - Roof Nailing Passed
08/31/2023 COT - RSBU - Exterior Clips/Sheathing Passed
10/13/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10/6/23: add fire blocking through out quadplex, fire foam all penetrations through top plates, unit furthest west missing receptacles in kitchen and laundry room, duct work needs to be strapped so it isn't hanging low, shower pans need to be under test.
10/11/23: add fire blocking through out quadplex, fire foam all penetrations through top plates
10/13/23: corrections made
11/08/2023 COT - RSBU - Firewall/Fire Barrier/Firestop Passed 10/19/23: not ready drywall fire barrier not up yet
11/8/23: passed
11/08/2023 COT - RSBU - Interior Shear Bracing Passed 11/8/23: passed
11/13/2023 COT - RSEL - Electrical Underground Passed
11/14/2023 COT - RSEL - Grounding/Bonding Passed
11/14/2023 BULD - Electrical Clearance Passed TEP ECO for units 1 and 2
11/17/23 Clearance resent to TEP
01/16/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading is required. 1/16/2024
01/16/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading is required. 1/16/2024
01/29/2024 COT - RSEL - Electrical Final Passed Electrical outlets in all 4 units are fully operational. Electrical sub-panels for all 4 units is properly labeled.
01/29/2024 COT - RSPL - Plumbing Final Passed Plumbing fixtures are installed and operational in all 4 units. Water heater is properly installed and functioning. Laundry area has hammer arrestor faucet installed.
01/29/2024 COT - RSME - Mechanical Final Passed Mechanical equipment is fully functional in all 4 units. Trim out of registers is complete. Thermostat is installed and working.
01/29/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is installed per plans on all 4 units.
02/27/2024 RSBU - Building Final Passed Corrections were made. 2/27/2024

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
2 STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
2 HVAC LOADS REPORT_V1.PDF DOCUMENTS VIEW
PLAN SET VERSION 4 (4-20-23)_V4.PDF DOCUMENTS VIEW
APPLICATION_V1.PDF DOCUMENTS VIEW
APPLICATION_V1.PDF DOCUMENTS VIEW