Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM05551
Permit Details
Apply Date:
07/21/2022
Applicant:
Jesus Florez
Description:
Duplex and Attached Sleeping Quarters
Permit Reviews
Permit Number - T22CM05551
Permit Status: Complete
Permit Description: Duplex and Attached Sleeping Quarters
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/21/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 08/17/2022 | COMPLETED |
09/07/2022 | RESUBMITTAL | 09/29/2022 | COMPLETED |
10/03/2022 | RESUBMITTAL | 10/04/2022 | COMPLETED |
05/05/2023 | RESTAMP - RESIDENTIAL v.1 | 05/09/2023 | APPROVED |
02/03/2023 | RESIDENTIAL NEW DWELLING v.1 | 02/10/2023 | REQUIRES RESUBMIT |
04/27/2023 | RESIDENTIAL NEW DWELLING v.4 | 04/27/2023 | REQUIRES RESUBMIT |
03/21/2023 | RESIDENTIAL NEW DWELLING v.3 | 04/19/2023 | REQUIRES RESUBMIT |
03/03/2023 | RESIDENTIAL NEW DWELLING v.2 | 03/07/2023 | REQUIRES RESUBMIT |
05/02/2023 | RESIDENTIAL NEW DWELLING v.5 | 05/05/2023 | APPROVED |
Conditions
Permit Number - T22CM05551
Permit Status: Complete
Permit Description: Duplex and Attached Sleeping Quarters
Date | Description | Comments |
---|---|---|
07/25/2022 | SPECIAL INSPECTION IS REQ'D FOR AN ELEVATION CERTIFICATE.THE ELEVATION OF THE FORMED PRE-SLAB MUST BE SUBMITTED ON AN ELEVATION CERTIFICATE AND SEALED BY A REGISTERED LAND SURVEYOR. FAX OR EMAIL ELEVATION CERTIFICATE TO: ATTENTION LOREN MAKUS. FAX: 879-8010, EMAIL: LOREN.MAKUS@TUCSONAZ.GOV. THIS CONDITION APPLIES TO INSPECTION 1015 AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927. | |
05/10/2023 | Contractor's active Arizona Contractor's License number for specified scope of work required prior to issuance of permit. , or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit. | |
06/14/2024 | FINAL ELEVATION CERTIFICATE REQUIRED: AN ORIGINAL FINAL ELEVATION CERTIFICATE SEALED BY A REGISTERED LAND SURVEYOR IS REQ'D. MAIL ELEVATION CERTIFICATE TO: CITY OF TUCSON, PLANNING & DEVELOPMENT SERVICES DEPT, ATTN: LOREN MAKUS, P.O. BOX 27210, TUCSON, AZ 85726-7210 OR DELIVER IT TO THE 1ST FL NORTH SIDE OF 201 N. STONE AVE. THIS CONDITION APPLIES TO ALL FINAL INSPECTIONS (1090, 2090, 3090, 4090) AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927. | |
05/05/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM05551
Permite Description: Duplex and Attached Sleeping Quarters
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/08/2022 | COT - LCPL - Plumbing Intermediate | N/A | Canceled | {Activity date: 09/08/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
09/08/2022 | RSME - Mechanical Progress | N/A | Canceled | {Activity date: 09/08/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
01/29/2024 | RSBU - Building Final | N/A | Partial Pass | Partial pass on building final. Interior needs to be cleaned of dirt, mud, and other construction debris. Exterior wood porches need to be stained and/or painted, and safety railing needs installed on all porches. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM05551
Permit Description: Duplex and Attached Sleeping Quarters
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/09/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 6-9-23: Rebar placement is per plans for stem walls. Okay for concrete placement in stem walls. | |
06/09/2023 | COT - RSBU - Stem Wall/Retaining Wall | Passed | 6-9-23: Rebar placement is per plans for stem walls. Okay for concrete placement in stem walls. | |
07/25/2023 | COT - RSPL - Rough Soil | Passed | ||
08/15/2023 | COT - RSBU - Preslab | Passed | Okay for concrete placement in slab. 8/15/2023 | |
08/31/2023 | COT - RSBU - Roof Nailing | Passed | ||
08/31/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
10/13/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10/6/23: add fire blocking through out quadplex, fire foam all penetrations through top plates, unit furthest west missing receptacles in kitchen and laundry room, duct work needs to be strapped so it isn't hanging low, shower pans need to be under test. 10/11/23: add fire blocking through out quadplex, fire foam all penetrations through top plates 10/13/23: corrections made |
|
11/08/2023 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | 10/19/23: not ready drywall fire barrier not up yet 11/8/23: passed |
|
11/08/2023 | COT - RSBU - Interior Shear Bracing | Passed | 11/8/23: passed | |
11/13/2023 | COT - RSEL - Electrical Underground | Passed | ||
11/14/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
11/14/2023 | BULD - Electrical Clearance | Passed | TEP ECO for units 1 and 2 11/17/23 Clearance resent to TEP |
|
01/16/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading is required. 1/16/2024 | |
01/16/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading is required. 1/16/2024 | |
01/29/2024 | COT - RSEL - Electrical Final | Passed | Electrical outlets in all 4 units are fully operational. Electrical sub-panels for all 4 units is properly labeled. | |
01/29/2024 | COT - RSPL - Plumbing Final | Passed | Plumbing fixtures are installed and operational in all 4 units. Water heater is properly installed and functioning. Laundry area has hammer arrestor faucet installed. | |
01/29/2024 | COT - RSME - Mechanical Final | Passed | Mechanical equipment is fully functional in all 4 units. Trim out of registers is complete. Thermostat is installed and working. | |
01/29/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is installed per plans on all 4 units. | |
02/27/2024 | RSBU - Building Final | Passed | Corrections were made. 2/27/2024 |