Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
522 N NORRIS AV
Apply Date:
07/21/2022
Applicant:
TFS Solar
Description:
R - roof mount 5.20kW DC photovoltaic solar system; 13 AC modules, 2 branches, PV subpanel, 30A PV b

Permit Reviews

Permit Number - T22CM05527
Permit Status: Complete
Permit Description: R - roof mount 5.20kW DC photovoltaic solar system; 13 AC modules, 2 branches, PV subpanel, 30A PV b
Start Date Submittal Complete Date Status  
07/21/2022 OTHER 09/30/2022 COMPLETED Review Details
10/07/2022 RESUBMITTAL 10/20/2022 ACTIVE Review Details
02/01/2023 RESIDENTIAL SOLAR v.1 02/10/2023 APPROVED Review Details
11/15/2022 RESIDENTIAL SOLAR v.1 11/28/2022 APPROVED Review Details

Conditions

Permit Number - T22CM05527
Permit Status: Complete
Permit Description: R - roof mount 5.20kW DC photovoltaic solar system; 13 AC modules, 2 branches, PV subpanel, 30A PV b
Date Description Comments
07/23/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
07/21/2022 THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM05527
Permite Description: R - roof mount 5.20kW DC photovoltaic solar system; 13 AC modules, 2 branches, PV subpanel, 30A PV b
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/06/2022 COT - RSEL - Electrical Final N/A Re-inspection required revise plans to show delegated 125A sub-panel
12/06/2022 RSBU - Building Final N/A Re-inspection required revise plans

Completed Inspections

Permit Status: Complete
Permit Number: T22CM05527
Permit Description: R - roof mount 5.20kW DC photovoltaic solar system; 13 AC modules, 2 branches, PV subpanel, 30A PV b
Total Completed Inspections - 3
Date Description Inspector Results Comments
02/14/2023 BULD - Electrical Clearance Passed Approved, DGC Clearance to TEP is required
02/14/2023 COT - RSEL - Electrical Final Passed
02/14/2023 RSBU - Building Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
ENVELOPE CALCULATIONS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 5527 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 5527 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SOILS REPORT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SUBMITTAL CHECKLIST 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
ENVELOPE CALCULATIONS.PDF DOCUMENTS VIEW
JOB CARD 5527.PDF DOCUMENTS VIEW
PERMIT 5527.PDF DOCUMENTS VIEW
SUBMITTAL CHECKLIST.PDF DOCUMENTS VIEW
SOILS REPORT.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
REV1 SENOR, M. PV 5.2 KW DRAWINGS_V1.PDF DOCUMENTS VIEW
REV1 SENOR, M. PV 5.2 KW REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPLICATION_V1.PDF DOCUMENTS VIEW
CONS-2_PLAN_V1.PDF DOCUMENTS VIEW
SPECS_V1.PDF DOCUMENTS VIEW