Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM05474
Permit Details
Apply Date:
07/19/2022
Applicant:
Denise Dunning
Description:
SFR F50B22 T22-M0032
Outstanding Activity Conditions
Permit Number - T22CM05474
Permit Status: Issued
Permit Description: SFR F50B22 T22-M0032
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
07/19/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
07/19/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
07/19/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
07/19/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-053/P20WP00249 IS ACCEPTEDAND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM05474
Permite Description: SFR F50B22 T22-M0032
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM05474
Permit Description: SFR F50B22 T22-M0032
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/22/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 07/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
07/22/2022 | COT - RSPL - Sewer | Passed | {Activity date: 07/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
07/22/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 07/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
07/29/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 07/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
07/29/2022 | COT - RSBU - Preslab | Passed | {Activity date: 07/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
07/29/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 07/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
07/29/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 07/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/13/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 09/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/13/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 09/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
04/25/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
04/25/2023 | RSME - Mechanical Progress | Passed | ||
04/25/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
04/25/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
04/25/2023 | COT - LCBU - Framing | Passed | ||
04/25/2023 | COT - RSEL - Construction Power | Passed | TEP ECO | |
05/10/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
08/17/2023 | COT - RSPL - Plumbing Final | Passed | ||
08/28/2023 | COT - RSEL - Electrical Final | Passed | ||
08/28/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
08/28/2023 | COT - RSME - Mechanical Final | Passed | ||
08/28/2023 | RSBU - Building Final | Passed | ||
08/28/2023 | ENGR Engineering Final | Passed |