Permit: T22CM05474
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
9751 E CARR PEAK TR
Address NEW:
9751 E CARR PEAK TR
Apply Date:
07/19/2022
Applicant:
Description:
SFR F50B22 T22-M0032
Outstanding Activity Conditions
Permit Number - T22CM05474
Permit Status: Issued
Permit Description: SFR F50B22 T22-M0032
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 07/19/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 07/19/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
| 07/19/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 07/19/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-053/P20WP00249 IS ACCEPTEDAND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM05474
Permite Description: SFR F50B22 T22-M0032
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM05474
Permit Description: SFR F50B22 T22-M0032
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 07/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 07/22/2022 | COT - RSPL - Sewer | Passed | {Activity date: 07/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 07/22/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 07/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 07/29/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 07/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 07/29/2022 | COT - RSBU - Preslab | Passed | {Activity date: 07/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 07/29/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 07/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 07/29/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 07/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 09/13/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 09/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 09/13/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | {Activity date: 09/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 04/25/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 04/25/2023 | RSME - Mechanical Progress | Passed | ||
| 04/25/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 04/25/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
| 04/25/2023 | COT - LCBU - Framing | Passed | ||
| 04/25/2023 | COT - RSEL - Construction Power | Passed | TEP ECO | |
| 05/10/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 08/17/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 08/28/2023 | COT - RSEL - Electrical Final | Passed | ||
| 08/28/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/28/2023 | COT - RSME - Mechanical Final | Passed | ||
| 08/28/2023 | RSBU - Building Final | Passed | ||
| 08/28/2023 | ENGR Engineering Final | Passed |