Permit: T22CM05376
Permit Details
Apply Date:
07/15/2022
Applicant:
Description:
SFR 235.2960 T21-M0055
Permit Reviews
Permit Number - T22CM05376
Permit Status: Complete
Permit Description: SFR 235.2960 T21-M0055
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/15/2022 | OTHER | 08/08/2022 | COMPLETED |
01/02/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/02/2024 | APPROVED |
Conditions
Permit Number - T22CM05376
Permit Status: Complete
Permit Description: SFR 235.2960 T21-M0055
Date | Description | Comments |
---|---|---|
07/15/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
07/15/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
07/15/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
07/15/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-059/P21WP00060, G-20-089/P21WP00061 AND THE DOWNSTREAM OFFSITE PUBLIC SEWER FORPARCEL 4 G-2020-087 IS ACCEPTED AND RELEASED BY PCRWRD | |
01/02/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM05376
Permite Description: SFR 235.2960 T21-M0055
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/28/2023 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | Not ready. Missing recessed step light at second landing. Pex lines need to be spaced 12" from can lights. Secure line for fixtures in master bathroom. Exhaust fan second floor master bathroom needs to be wired. Blocking at register second floor. 4/28/2023 |
04/28/2023 | COT - RSEL - Construction Power | N/A | Not Ready | |
04/28/2023 | COT - RSPL - Gas Pressure Test | N/A | Not Ready | |
04/28/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | Not ready. Missing recessed step light at second landing. Pex lines need to be spaced 12" from can lights. Secure line for fixtures in master bathroom. Exhaust fan second floor master bathroom needs to be wired. Blocking at register second floor. 4/28/2023 |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM05376
Permit Description: SFR 235.2960 T21-M0055
Total Completed Inspections - 23