Permit: T22CM05358
Permit Details
Apply Date:
07/14/2022
Applicant:
Description:
SFR 230.2380 T21-M0028
Conditions
Permit Number - T22CM05358
Permit Status: Issued
Permit Description: SFR 230.2380 T21-M0028
Date | Description | Comments |
---|---|---|
07/14/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
07/14/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
07/14/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
07/14/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-100/P21WP00059, G-20-059/P20WP00060, G-20-089/P20WP00061 AND THE DOWNSTREAM OFFSITEPUBLIC SEWER FOR PARCEL 4 G-2020-087 IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM05358
Permite Description: SFR 230.2380 T21-M0028
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSBU - Roof Nailing | N/A | Not Ready | |
10/26/2022 | COT - RSBU - Exterior Clips/Sheathing | N/A | Not Ready | |
11/10/2022 | COT - HCBU - Interior Shear Bracing | N/A | Partial Pass | 1025 ext clips and sheathing approved. |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM05358
Permit Description: SFR 230.2380 T21-M0028
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/03/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 10/03/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} | |
10/03/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 10/03/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved. Shading required.} | |
10/11/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
10/11/2022 | COT - RSBU - Preslab | Passed | {Activity date: 10/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
10/11/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
10/11/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
01/06/2023 | COT - LCBU - Framing | Passed | ||
01/06/2023 | COT - RSEL - Construction Power | Passed | TEP ECO | |
01/06/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
01/06/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
01/06/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
01/23/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
04/07/2023 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
04/17/2023 | COT - RSPL - Sewer | Passed | Pass | |
05/22/2023 | COT - RSPL - Plumbing Final | Passed | ||
05/22/2023 | RSME - Mechanical Progress | Passed | ||
05/22/2023 | ENGR Engineering Final | Passed | ||
05/22/2023 | COT - RSME - Mechanical Final | Passed | ||
05/22/2023 | RSBU - Building Final | Passed | ||
05/22/2023 | COT - RSEL - Electrical Final | Passed | ||
05/22/2023 | COT - RSEL - Outdoor Lighting | Passed |