Permit: T22CM05323
Permit Details
Apply Date:
07/13/2022
Applicant:
Brandon Kempel
Description:
SFR F60B22 T22-M0027
Permit Reviews
Permit Number - T22CM05323
Permit Status: Complete
Permit Description: SFR F60B22 T22-M0027
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/13/2022 | OTHER | 07/28/2022 | COMPLETED |
10/16/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/17/2023 | APPROVED |
11/13/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 11/13/2023 | REQUIRES RESUBMIT |
11/15/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 11/15/2023 | APPROVED |
11/03/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/09/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - T22CM05323
Permit Status: Complete
Permit Description: SFR F60B22 T22-M0027
Date | Description | Comments |
---|---|---|
07/13/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
07/13/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
10/17/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
10/17/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
10/17/2023 | ISSUED WITH PCRWRD CONDITIONS: NO FINAL UNTIL THE PUBLIC SEWER G-2020-053/P20WP00249 IS ACCEPTED AND RELEASED PCRWRD | |
07/13/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. | |
10/17/2023 | Post-Tension Inspection Report is required. | |
10/17/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM05323
Permite Description: SFR F60B22 T22-M0027
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSBU - Roof Nailing | N/A | Not Ready | |
07/31/2023 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | Provide positive slope for b vent and 1" minimum clearance to combustibles. |
08/28/2023 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM05323
Permit Description: SFR F60B22 T22-M0027
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/17/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 08/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/17/2022 | COT - RSPL - Sewer | Passed | {Activity date: 08/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/17/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 08/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/31/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 08/31/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
08/31/2022 | COT - RSBU - Preslab | Passed | {Activity date: 08/31/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
08/31/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 08/31/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
08/31/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/31/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
10/20/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 10/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
01/17/2023 | COT - RSBU - Roof Nailing | Passed | ||
03/24/2023 | BULD - Electrical Clearance | Passed | Gas lines are complete. Ball valves are installed at all appliance locations. | |
03/24/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
03/24/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Rough in for mechanical, electrical, sprinkler, and plumbing. | |
03/24/2023 | COT - LCPL - Plumbing Intermediate | Passed | Plumbing rough in is complete. Bath tubs are installed and filled with water. Laundry area is properly plumbed. | |
03/24/2023 | COT - RSEL - Construction Power | Passed | Electrical panel is properly installed. Okay to connect for temporary power. | |
03/24/2023 | COT - LCBU - Framing | Passed | ||
03/24/2023 | RSME - Mechanical Progress | Passed | ductwork and registers are complete. | |
04/21/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
08/22/2023 | COT - RSPL - Plumbing Final | Passed | ||
08/28/2023 | COT - RSEL - Electrical Final | Passed | ||
08/28/2023 | COT - RSME - Mechanical Final | Passed | ||
08/28/2023 | ENGR Engineering Final | Passed | ||
08/28/2023 | RSBU - Building Final | Passed | ||
08/28/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
11/21/2023 | COT - FCON - Sprinkler - Final | Passed |