Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
In Review
Type:
Residential Building - One or Two Family
Apply Date:
07/13/2022
Applicant:
Denise Dunning
Description:
SFR F60B22 T22-M0027

Permit Reviews

Permit Number - T22CM05321
Permit Status: In review
Permit Description: SFR F60B22 T22-M0027
Start Date Submittal Complete Date Status  
07/13/2022 OTHER 07/28/2022 COMPLETED Review Details
01/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - T22CM05321
Permit Status: In review
Permit Description: SFR F60B22 T22-M0027
Total Outstanding Activity Conditions - 4
Date Name
07/13/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
07/13/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
07/13/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/13/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Completed Inspections

Permit Status: In Review
Permit Number: T22CM05321
Permit Description: SFR F60B22 T22-M0027
Total Completed Inspections - 24
Date Description Inspector Results Comments
08/08/2022 COT - RSPL - Yard Water Line Passed {Activity date: 08/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/08/2022 COT - RSPL - Sewer Passed {Activity date: 08/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/08/2022 COT - RSPL - Rough Soil Passed {Activity date: 08/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/26/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 08/26/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/26/2022 COT - RSBU - Preslab Passed {Activity date: 08/26/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/26/2022 COT - RSEL - Electrical Underground Passed {Activity date: 08/26/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/26/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 08/26/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
10/13/2022 COT - RSBU - Roof Nailing Passed {Activity date: 10/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/10/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE}
10/13/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 10/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/10/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE
1. Provide truss calcs
2. Install anchor bolt within 12” of end of shear walls}
11/14/2022 COT - LCBU - Framing Passed
01/30/2023 COT - RSPL - Gas Pressure Test Passed
01/30/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/30/2023 COT - LCPL - Plumbing Intermediate Passed
01/30/2023 RSME - Mechanical Progress Passed
01/30/2023 COT - RSEL - Construction Power Passed TEP ECO
03/17/2023 COT - HCBU - Interior Shear Bracing Passed
06/09/2023 COT - BULD - SWG Clearance Passed
06/16/2023 ENGR Engineering Final Passed
06/20/2023 COT - FCON - Sprinkler - Final Passed
06/23/2023 COT - RSEL - Electrical Final Passed
06/23/2023 COT - RSEL - Outdoor Lighting Passed
06/23/2023 RSBU - Building Final Passed
07/18/2023 COT - RSPL - Plumbing Final Passed
07/18/2023 COT - RSME - Mechanical Final Passed

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW