Permit: T22CM05286
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
670 S SUNFIELD CANYON DR
Address NEW:
670 S SUNFIELD CANYON DR
Apply Date:
07/13/2022
Applicant:
Description:
R - Installation of 13.60KW PV System with battery 10.5/MPU 200A/Derate to 175A
Permit Reviews
Permit Number - T22CM05286
Permit Status: Issued
Permit Description: R - Installation of 13.60KW PV System with battery 10.5/MPU 200A/Derate to 175A
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/13/2022 | OTHER | 07/29/2022 | COMPLETED |
| 03/06/2023 | RESIDENTIAL SOLAR v.1 | 03/31/2023 | APPROVED |
| 04/10/2023 | RESIDENTIAL SOLAR v.1 | 05/09/2023 | APPROVED |
| 01/25/2023 | RESIDENTIAL SOLAR v.1 | 02/09/2023 | APPROVED |
Conditions
Permit Number - T22CM05286
Permit Status: Issued
Permit Description: R - Installation of 13.60KW PV System with battery 10.5/MPU 200A/Derate to 175A
| Date | Description | Comments |
|---|---|---|
| 07/29/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 07/13/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM05286
Permite Description: R - Installation of 13.60KW PV System with battery 10.5/MPU 200A/Derate to 175A
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/01/2023 | BULD - Electrical Clearance | N/A | Re-inspection required | plans must be revised to show system without Battery |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM05286
Permit Description: R - Installation of 13.60KW PV System with battery 10.5/MPU 200A/Derate to 175A
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/25/2023 | COT - RSEL - Service Upgrade | Passed | pending solar | |
| 06/05/2023 | RSBU - Building Final | Passed | ||
| 06/05/2023 | COT - RSEL - Electrical Final | Passed | 6/5/23 - Addition and Replacement of existing system. Revision Approved. |