Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
07/13/2022
Applicant:
Description:
R - Installation of 13.60KW PV System with battery 10.5/MPU 200A/Derate to 175A

Permit Reviews

Permit Number - T22CM05286
Permit Status: Issued
Permit Description: R - Installation of 13.60KW PV System with battery 10.5/MPU 200A/Derate to 175A
Start Date Submittal Complete Date Status  
07/13/2022 OTHER 07/29/2022 COMPLETED Review Details
03/06/2023 RESIDENTIAL SOLAR v.1 03/31/2023 APPROVED Review Details
04/10/2023 RESIDENTIAL SOLAR v.1 05/09/2023 APPROVED Review Details
01/25/2023 RESIDENTIAL SOLAR v.1 02/09/2023 APPROVED Review Details

Conditions

Permit Number - T22CM05286
Permit Status: Issued
Permit Description: R - Installation of 13.60KW PV System with battery 10.5/MPU 200A/Derate to 175A
Date Description Comments
07/29/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
07/13/2022 THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM05286
Permite Description: R - Installation of 13.60KW PV System with battery 10.5/MPU 200A/Derate to 175A
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/01/2023 BULD - Electrical Clearance N/A Re-inspection required plans must be revised to show system without Battery

Completed Inspections

Permit Status: Issued
Permit Number: T22CM05286
Permit Description: R - Installation of 13.60KW PV System with battery 10.5/MPU 200A/Derate to 175A
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/25/2023 COT - RSEL - Service Upgrade Passed pending solar
06/05/2023 RSBU - Building Final Passed
06/05/2023 COT - RSEL - Electrical Final Passed 6/5/23 - Addition and Replacement of existing system. Revision Approved.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
STRUCTURAL_CALCULATION_V1.PDF DOCUMENTS VIEW
CONS-REVISED CONSTRCTION PLAN 3_V1.PDF DOCUMENTS VIEW
REVISION APPLICATION_V1.PDF DOCUMENTS VIEW
REVISION LETTER_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-REVISED CONSTRUCTION PLAN_V1.PDF DOCUMENTS VIEW
REVISION LETTER_V1.PDF DOCUMENTS VIEW