Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Address:
300 W GRANT RD
Apply Date:
07/12/2022
Applicant:
Description:
(T22DV03790) Rewire electrical, repair fire damage

Permit Reviews

Permit Number - T22CM05273
Permit Status: Issued
Permit Description: (T22DV03790) Rewire electrical, repair fire damage
Start Date Submittal Complete Date Status  
07/12/2022 OTHER 08/19/2022 COMPLETED Review Details
08/19/2022 RESUBMITTAL 09/05/2022 COMPLETED Review Details
09/13/2022 RESUBMITTAL 09/21/2022 COMPLETED Review Details

Conditions

Permit Number - T22CM05273
Permit Status: Issued
Permit Description: (T22DV03790) Rewire electrical, repair fire damage
Date Description Comments
09/26/2022 Prior to permit issuance a General Contractor Letter (GCL) is required

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM05273
Permite Description: (T22DV03790) Rewire electrical, repair fire damage
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/03/2022 COT - LCBU - Building Progress N/A Canceled {Activity date: 10/03/2022; Status: Not Applicable; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Not a required inspection
}

Completed Inspections

Permit Status: Issued
Permit Number: T22CM05273
Permit Description: (T22DV03790) Rewire electrical, repair fire damage
Total Completed Inspections - 7
Date Description Inspector Results Comments
10/03/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 10/03/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
10/03/2022 COT - LCBU - Framing Passed {Activity date: 10/03/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
10/03/2022 COT - LCEL - Electrical Above Ceiling Passed {Activity date: 10/03/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
10/11/2022 COT - LCBU - Building Final Passed {Activity date: 10/11/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap}
10/11/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 10/11/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - CODE REC}
10/11/2022 COT - LCEL - Electrical Final Passed {Activity date: 10/11/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap

Called TEP at 1pm

Clear rec
} ; {Activity date: 10/10/2022; Status: Denied; Inspector: DQUINN; Comment: Entered by NGARCIA3 - denied

None of the listed repairs were looked at, after seeing the wrong main panel installation. The installed panel is a sub panel, that has no facility for a main disconnect.}
10/11/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 10/11/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap}

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GCL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN.PDF DOCUMENTS VIEW