Permit: T22CM05199
Permit Details
Apply Date:
07/08/2022
Applicant:
Russ Salmon
Description:
SFR LENNLE4001 T22-M0045
Permit Reviews
Permit Number - T22CM05199
Permit Status: Issued
Permit Description: SFR LENNLE4001 T22-M0045
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/07/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/11/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM05199
Permit Status: Issued
Permit Description: SFR LENNLE4001 T22-M0045
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
07/08/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
07/08/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
07/08/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-90/P21WP00062 IS ACCEPTED AND RELEASED BY PCRWRD |
07/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
07/18/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - T22CM05199
Permit Status: Issued
Permit Description: SFR LENNLE4001 T22-M0045
Date | Description | Comments |
---|---|---|
07/08/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM05199
Permite Description: SFR LENNLE4001 T22-M0045
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - LCBU - Framing | N/A | Not Ready | |
10/26/2022 | COT - RSEL - Construction Power | N/A | Not Ready | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM05199
Permit Description: SFR LENNLE4001 T22-M0045
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/10/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 08/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
08/10/2022 | COT - RSPL - Sewer | Passed | {Activity date: 08/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
08/10/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 08/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
08/19/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 08/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
08/19/2022 | COT - RSBU - Preslab | Passed | {Activity date: 08/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
08/19/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 08/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
08/19/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/13/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 09/13/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} | |
09/20/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 09/20/2022; Status: Approved; Inspector: SCARAZCO; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/15/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready. Per previous notes.} ; {Activity date: 09/13/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - not ready. Sheathing should not be less than 16”. Missing washer on anchor bolts along with some anchor bolts. } |
|
12/08/2022 | COT - LCBU - Framing | Passed | ||
12/08/2022 | RSME - Mechanical Progress | Passed | ||
12/08/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
12/08/2022 | COT - LCPL - Plumbing Intermediate | Passed | ||
12/08/2022 | COT - RSPL - Gas Pressure Test | Passed | holding 15 psi | |
12/08/2022 | COT - RSEL - Construction Power | Passed | clearance for TEP ECO. | |
01/03/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
03/14/2023 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
04/26/2023 | COT - RSPL - Plumbing Final | Passed | All plumbing fixtures are installed and operational. | |
04/26/2023 | COT - RSEL - Electrical Final | Passed | All outlets are installed and operational. GFCI & AFCI breakers are located in the outside electrical panel. | |
04/26/2023 | COT - RSEL - Outdoor Lighting | Passed | Porch lights meet City code. | |
04/26/2023 | COT - RSME - Mechanical Final | Passed | HVAC Equipment is installed and operational. Duct registers are located in every room. | |
04/26/2023 | RSBU - Building Final | Passed | Residence is complete per plans. Okay to issue C of O. | |
04/26/2023 | ENGR Engineering Final | Passed |