Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
07/08/2022
Applicant:
Russ Salmon
Description:
SFR LENNLE4002 T22-M0046

Permit Reviews

Permit Number - T22CM05191
Permit Status: Issued
Permit Description: SFR LENNLE4002 T22-M0046
Start Date Submittal Complete Date Status  
08/07/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/11/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T22CM05191
Permit Status: Issued
Permit Description: SFR LENNLE4002 T22-M0046
Total Outstanding Activity Conditions - 5
Date Name
07/08/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
07/08/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
07/08/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2020-90/P21WP00062 IS ACCEPTED AND RELEASED BY PCRWRD
07/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/18/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - T22CM05191
Permit Status: Issued
Permit Description: SFR LENNLE4002 T22-M0046
Date Description Comments
07/08/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM05191
Permite Description: SFR LENNLE4002 T22-M0046
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM05191
Permit Description: SFR LENNLE4002 T22-M0046
Total Completed Inspections - 24
Date Description Inspector Results Comments
08/05/2022 COT - RSPL - Yard Water Line Passed {Activity date: 08/05/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/05/2022 COT - RSPL - Sewer Passed {Activity date: 08/05/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/05/2022 COT - RSPL - Rough Soil Passed {Activity date: 08/05/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/16/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 08/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
08/16/2022 COT - RSBU - Preslab Passed {Activity date: 08/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
08/16/2022 COT - RSEL - Electrical Underground Passed {Activity date: 08/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
08/16/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 08/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
09/15/2022 COT - RSBU - Roof Nailing Passed {Activity date: 09/15/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/09/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready}
09/15/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 09/15/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/09/2022; Status: Denied; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - denied. 1.Replace trim studs at master bedroom. Need to be 2x6.
2. Titan bolts need to be installed.
3. Remove nails at ladder bracing
4. Stud clips need to be nailed
5. Covered patio trim and king studs need to be 2x6 per plan}
12/15/2022 COT - RSEL - Construction Power Passed
12/15/2022 BULD - Electrical Clearance Passed TEP ECO
01/04/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/04/2023 COT - RSPL - Gas Pressure Test Passed
01/04/2023 COT - LCBU - Framing Passed
01/04/2023 RSME - Mechanical Progress Passed
01/04/2023 COT - LCPL - Plumbing Intermediate Passed
01/20/2023 COT - HCBU - Interior Shear Bracing Passed
04/17/2023 COT - BULD - SWG Clearance Passed Pass
05/18/2023 COT - RSPL - Plumbing Final Passed
05/18/2023 RSBU - Building Final Passed
05/18/2023 COT - RSEL - Electrical Final Passed
05/18/2023 COT - RSEL - Outdoor Lighting Passed
05/18/2023 COT - RSME - Mechanical Final Passed
05/18/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
CONS-T22CM05191_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW