Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM05153
Permit Details
Apply Date:
07/08/2022
Applicant:
Denise Dunning
Description:
SFR F50B22 T22-M0032
Permit Reviews
Permit Number - T22CM05153
Permit Status: Complete
Permit Description: SFR F50B22 T22-M0032
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/01/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/04/2023 | APPROVED |
Conditions
Permit Number - T22CM05153
Permit Status: Complete
Permit Description: SFR F50B22 T22-M0032
Date | Description | Comments |
---|---|---|
07/08/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
07/08/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
07/08/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
07/08/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-053 IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM05153
Permite Description: SFR F50B22 T22-M0032
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSBU - Roof Nailing | N/A | Not Ready | |
10/26/2022 | COT - RSEL - Construction Power | N/A | Not Ready | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM05153
Permit Description: SFR F50B22 T22-M0032
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/03/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 08/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
08/03/2022 | COT - RSPL - Sewer | Passed | {Activity date: 08/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
08/03/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 08/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
08/11/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 08/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/11/2022 | COT - RSBU - Preslab | Passed | {Activity date: 08/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/11/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 08/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/11/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
10/13/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 10/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/27/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE Interior hallway openings are roughed in at 34", which will finish out at 33". Min width of a hallway is 36" & min width of a hallway opening is also 36"} |
|
11/16/2022 | COT - RSBU - Roof Nailing | Passed | ||
03/09/2023 | COT - RSEL - Construction Power | Passed | Approved. Clearance for TEP ECO. 3/9/2023 | |
03/09/2023 | RSME - Mechanical Progress | Passed | ||
03/09/2023 | COT - RSPL - Gas Pressure Test | Passed | Approved. Holding 15 psi. 3/9/2023 | |
03/09/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
03/09/2023 | COT - LCBU - Framing | Passed | ||
03/13/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
04/03/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
06/08/2023 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
08/08/2023 | COT - RSPL - Plumbing Final | Passed | ||
08/08/2023 | COT - RSME - Mechanical Final | Passed | ||
08/08/2023 | ENGR Engineering Final | Passed | ||
08/08/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
08/08/2023 | COT - RSEL - Electrical Final | Passed | ||
08/08/2023 | RSBU - Building Final | Passed |