Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
07/07/2022
Applicant:
David Valencia
Description:
New construction of a Community Building #1

Permit Reviews

Permit Number - T22CM05106
Permit Status: Issued
Permit Description: New construction of a Community Building #1
Start Date Submittal Complete Date Status  
07/07/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 08/31/2022 COMPLETED Review Details
02/17/2023 COMMERCIAL REVIEW - FULL v.2 03/16/2023 APPROVED Review Details
03/06/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/02/2024 APPROVED Review Details
04/05/2023 COMMERCIAL REVIEW - FULL v.1 05/10/2023 APPROVED Review Details
11/10/2022 COMMERCIAL REVIEW - FULL v.1 01/04/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - T22CM05106
Permit Status: Issued
Permit Description: New construction of a Community Building #1
Total Outstanding Activity Conditions - 13
Date Name
09/11/2024 AIR BALANCING REPORT IS REQUIRED.
09/11/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
09/11/2024 COMMISSIONING REPORT IS REQUIRED.
09/11/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
09/11/2024 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
09/11/2024 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
09/11/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/11/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
09/11/2024 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
09/11/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
09/11/2024 WATER STERILIZATION REPORT IS REQUIRED.
12/12/2023 ACCEPT AND RELEASE THE PUBLIC MANHOLE TAP
12/12/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - T22CM05106
Permit Status: Issued
Permit Description: New construction of a Community Building #1
Date Description Comments
01/04/2023 Please contact Pima County Addressing to resolve your addressing issue related to FILL IN THIS SPACE. Addressing@pima.gov or 520-724-9512
02/27/2023 I-Joists Designs must be submitted and approved prior to Final Inspection
03/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM05106
Permite Description: New construction of a Community Building #1
Total Outstanding Inspections - 12
Last Inspection Date Description Inspector Results Comments
05/17/2024 COT - HCBU - Roof Nailing N/A Partial Pass Level one.
05/17/2024 COT - HCBU - Interior Shear Bracing N/A Partial Pass Wood shear walls for Level One.
07/18/2024 COT - HCBU - Firewall/Fire Barrier/Firestop N/A Not Applicable
07/18/2024 COT - HCBU - Building Above Ceiling N/A Not Ready OK to insulate and drywall.
09/19/2024 BULD - Electrical Clearance N/A Not Ready Wanted other inspections not on permit.
12/11/2023 COT - HCBU - Masonry Pregrout N/A Partial Pass 12/11/23: 1st lift of south site wall and 60 l/f of the west site wall.
07/18/2024 COT - HCEL - Electrical Above Ceiling N/A Not Ready ok to drywall
07/18/2024 COT - LCME - Mechanical Above Ceiling N/A Not Ready hard lids ok
10/21/2024 COT - HCPL - Plumbing Final N/A Not Ready work incomplete.
09/24/2024 COT - BULD - SWG Clearance N/A Not Ready
11/07/2024 COT - FCON - Alarm - Final N/A Partial Pass pendibg ROC and 1st year annual inspection
11/07/2024 COT - FCON - Sprinkler - Final N/A Partial Pass Ceiling shall be intact

Completed Inspections

Permit Status: Issued
Permit Number: T22CM05106
Permit Description: New construction of a Community Building #1
Total Completed Inspections - 24
Date Description Inspector Results Comments
09/13/2023 COT - HCBU - Building Progress Passed
12/19/2023 COT - HCPL - Sewer Passed
01/29/2024 COT - HCPL - Yard Water Line Passed
02/21/2024 COT - HCPL - Rough Soil Passed
03/22/2024 COT - HCEL - Grounding/Bonding Passed
03/22/2024 COT - HCBU - Preslab Passed
05/31/2024 COT - HCBU - Roof Nailing Passed
06/11/2024 COT - HCBU - Framing Passed
06/11/2024 COT - HCBU - Interior Shear Bracing Passed
07/02/2024 COT - HCBU - Stem Wall/Retaining Wall Passed
07/03/2024 COT - HCPL - Plumbing Above Ceiling Passed
07/03/2024 COT - HCPL - Plumbing Intermediate Passed
07/03/2024 COT - LCME - Mechanical Intermediate Passed
07/18/2024 COT - HCEL - Electrical Intermediate Passed
09/17/2024 COT - HCBU - Building Above Ceiling Passed
09/18/2024 COT - HCBU - Excavation/Rebar/Zoning Passed
09/20/2024 COT - HCEL - Electrical Underground Passed Shade structure.
10/18/2024 COT - HCBU - Masonry Pregrout Passed
10/18/2024 COT - HCEL - Electrical Above Ceiling Passed
10/18/2024 COT - HCEL - Electrical Final Passed
10/18/2024 COT - LCME - Mechanical Above Ceiling Passed
10/21/2024 COT - HCEL - Outdoor Lighting Passed
10/31/2024 COT - BULD - SWG Clearance Passed
10/31/2024 COT - LCME - Mechanical Final Passed

Documents

File Name Document Type  
1_PIMA INDUSTRIAL WASTE APPROVAL_V1.PDF DOCUMENTS VIEW
10357 RER - IJOISTS LAYOUT R2 - APPROVED AS NOTED_V1.PDF DOCUMENTS VIEW
SPAPP-3_RESIDENCE_ELECTRICAL REVISION LETTER-2023-03-29_V1.PDF DOCUMENTS VIEW
CONS-3_RESIDENCE_ELECTRICAL DRAWING REVISION_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
2_COMMERCIAL-95-340-FR-PRODUCT-PROFILE-US-REV-1-MARCH-2020_V1.PDF DOCUMENTS VIEW
2_DP22-0145 FOR REFERENCE ONLY_V1.PDF DOCUMENTS VIEW
2_GEOTECHNICAL REPORT WITH ADDENDUM 1_V1.PDF DOCUMENTS VIEW
2_SPECIFICATIONS 08 71 00 RESIDENCE_V1.PDF DOCUMENTS VIEW
CONS-2_PLAN SET_V1.PDF DOCUMENTS VIEW
SPAPP-2_T22CM05106 PERMIT REVIEW COMMENTS RESPONSE LETTER-2022-11-04_V1.PDF DOCUMENTS VIEW
2_COMMERCIAL-95-340-FR-PRODUCT-PROFILE-US-REV-1-MARCH-2020_V1.PDF DOCUMENTS VIEW
2_DP22-0145 FOR REFERENCE ONLY_V1.PDF DOCUMENTS VIEW
2_GEOTECHNICAL REPORT WITH ADDENDUM 1_V1.PDF DOCUMENTS VIEW
2_SPECIFICATIONS 08 71 00 RESIDENCE_V1.PDF DOCUMENTS VIEW
CONS-2_PLAN SET_V1.PDF DOCUMENTS VIEW
SPAPP-2_T22CM05106 PERMIT REVIEW COMMENTS RESPONSE LETTER-2022-11-04_V1.PDF DOCUMENTS VIEW