Permit: T22CM05045
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
8350 E OLD VAIL RD
Address NEW:
8350 E OLD VAIL RD
Apply Date:
07/05/2022
Applicant:
Ashley Benjamin
Description:
(T21DV09036) Roof & patio truck strike repair (this is a structural repair
Permit Reviews
Permit Number - T22CM05045
Permit Status: Complete
Permit Description: (T21DV09036) Roof & patio truck strike repair (this is a structural repair
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/05/2022 | OTHER | 07/28/2022 | COMPLETED |
| 01/11/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/11/2024 | APPROVED |
| 02/21/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/21/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - T22CM05045
Permit Status: Complete
Permit Description: (T21DV09036) Roof & patio truck strike repair (this is a structural repair
| Date | Description | Comments |
|---|---|---|
| 07/28/2022 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
| 07/28/2022 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
| 07/28/2022 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 07/28/2022 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 07/28/2022 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM05045
Permite Description: (T21DV09036) Roof & patio truck strike repair (this is a structural repair
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/24/2023 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 6/21/23: two tall concrete columns on the west side approved to pour 7/21/23: approved plans not on site. 7/24/23: reinforcing and ledger anchor bolts for pre-cast wall panels are per plan. |
| COT - FCON - Sprinkler - Final | N/A | Not Ready | Hard lid needs to be installed. | |
| COT - FCON - Fire - Final | N/A | Not Ready | Hard lid needs to be installed. | |
| 11/09/2023 | COT - LCEL - Electrical Final | N/A | Partial Pass |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM05045
Permit Description: (T21DV09036) Roof & patio truck strike repair (this is a structural repair
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/25/2023 | COT - LCBU - Excavation/Rebar/Zoning | Passed | 6/21/23: two tall concrete columns on the west side approved to pour 7/21/23: approved plans not on site. 7/24/23: reinforcing and ledger anchor bolts for pre-cast wall panels are per plan. 9/25/23: pre-slab approved. |
|
| 09/25/2023 | COT - LCBU - Preslab | Passed | ||
| 10/10/2023 | COT - LCBU - Framing | Passed | ||
| 10/10/2023 | COT - LCBU - Roof Nailing | Passed | ||
| 10/20/2023 | COT - HCEL - Electrical Above Ceiling | Passed | 10/20/23: Electrical above ceiling per plan ok to proceed. | |
| 01/11/2024 | COT - FCON - Sprinkler - Final | Passed | ||
| 01/11/2024 | COT - FCON - Fire - Final | Passed | ||
| 01/12/2024 | COT - LCBU - Building Final | Passed | ||
| 01/12/2024 | COT - LCEL - Electrical Final | Passed |