Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
07/02/2022
Applicant:
ramon polanco
Description:
SFR BRIO1432 T20-M0058

Permit Reviews

Permit Number - T22CM05002
Permit Status: Complete
Permit Description: SFR BRIO1432 T20-M0058
Start Date Submittal Complete Date Status  
07/02/2022 OTHER 08/05/2022 COMPLETED Review Details
02/07/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/09/2024 APPROVED Review Details

Conditions

Permit Number - T22CM05002
Permit Status: Complete
Permit Description: SFR BRIO1432 T20-M0058
Date Description Comments
07/02/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
07/02/2022 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
07/02/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
08/05/2022 Prior to permit issuance a General Contractor Letter (GCL) is required
02/26/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/26/2024 Water Meter Size
02/26/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/26/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/26/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM05002
Permite Description: SFR BRIO1432 T20-M0058
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/11/2023 BULD - Electrical Clearance N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM05002
Permit Description: SFR BRIO1432 T20-M0058
Total Completed Inspections - 22
Date Description Inspector Results Comments
02/15/2023 COT - RSPL - Rough Soil Passed
02/27/2023 COT - RSBU - Preslab Passed
08/04/2023 RSME - Mechanical Progress Passed
08/08/2023 RSEL - Electrical Progress Passed
08/09/2023 COT - LCPL - Plumbing Intermediate Passed
09/25/2023 COT - HCBU - Interior Shear Bracing Passed
10/11/2023 BULD - Electrical Clearance Passed 10/11/23: ECO TEP Clearance unit #115
01/26/2024 COT - RSPL - Yard Water Line Passed
01/26/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
01/26/2024 COT - RSPL - Sewer Passed
01/26/2024 COT - RSEL - Electrical Final Passed
01/26/2024 COT - RSEL - Electrical Underground Passed
01/26/2024 COT - RSBU - Roof Nailing Passed
01/26/2024 COT - RSME - Mechanical Final Passed
01/26/2024 RSBU - Building Final Passed
01/26/2024 COT - RSEL - Grounding/Bonding Passed
01/26/2024 COT - LCBU - Framing Passed
01/26/2024 COT - RSEL - Construction Power Passed
01/26/2024 COT - RSBU - Sustainability Passed
01/26/2024 COT - RSPL - Plumbing Final Passed
01/26/2024 COT - RSBU - Exterior Clips/Sheathing Passed
02/13/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
2 BEDROOM STRUCTURAL CALCS REV1_V1.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
SIC BLDG 115 2-26-24-2024-02-26_V1.PDF DOCUMENTS VIEW
BLDG 115 SIC-2024-02-05_V1.PDF DOCUMENTS VIEW
1_APPLICATION T22CM05002.PDF DOCUMENTS VIEW
SIC BLDG 115.PDF DOCUMENTS VIEW
UTILITY PLAN 113-129.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW