Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM04961
Permit Details
Apply Date:
07/01/2022
Applicant:
Andrea Flood
Description:
SFR STF40K T20-M0039
Outstanding Activity Conditions
Permit Number - T22CM04961
Permit Status: Issued
Permit Description: SFR STF40K T20-M0039
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
07/01/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
07/01/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
07/01/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
07/01/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM04961
Permite Description: SFR STF40K T20-M0039
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
RSME - Mechanical Progress | N/A | Requested | ||
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM04961
Permit Description: SFR STF40K T20-M0039
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/04/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 08/04/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/04/2022 | COT - RSPL - Sewer | Passed | {Activity date: 08/04/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/04/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 08/04/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/16/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 08/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/16/2022 | COT - RSBU - Preslab | Passed | {Activity date: 08/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/16/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 08/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/16/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
10/05/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 10/05/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
10/05/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 10/05/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
02/03/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
02/03/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
02/03/2023 | COT - RSEL - Construction Power | Passed | TEP ECO | |
02/03/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
02/03/2023 | COT - LCBU - Framing | Passed | ||
03/02/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
05/01/2023 | COT - BULD - SWG Clearance | Passed | SWG clearance required | |
05/01/2023 | COT - RSPL - Plumbing Final | Passed | ||
05/05/2023 | COT - RSEL - Electrical Final | Passed | ||
05/05/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
05/05/2023 | COT - RSME - Mechanical Final | Passed | ||
05/05/2023 | RSBU - Building Final | Passed | ||
05/25/2023 | ENGR Engineering Final | Passed |