Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM04905
Permit Details
Apply Date:
06/28/2022
Applicant:
Denise Dunning
Description:
SFR F60B22 T22-M0027
Permit Reviews
Permit Number - T22CM04905
Permit Status: Issued
Permit Description: SFR F60B22 T22-M0027
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/28/2022 | OTHER | 07/28/2022 | COMPLETED |
07/14/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/21/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM04905
Permit Status: Issued
Permit Description: SFR F60B22 T22-M0027
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
06/28/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-053/P20WP00249 IS ACCEPTEDAND RELEASED BY PCRWRD |
Conditions
Permit Number - T22CM04905
Permit Status: Issued
Permit Description: SFR F60B22 T22-M0027
Date | Description | Comments |
---|---|---|
06/28/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
06/28/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
06/28/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
07/21/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
07/21/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
07/21/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/21/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM04905
Permite Description: SFR F60B22 T22-M0027
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM04905
Permit Description: SFR F60B22 T22-M0027
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/02/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/02/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 09/01/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - } ; {Activity date: 08/26/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CA per Scott} ; {Activity date: 08/22/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CA per Scott Fisher} | |
09/02/2022 | COT - RSPL - Sewer | Passed | {Activity date: 09/02/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 09/01/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - } ; {Activity date: 08/26/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CA per Scott} ; {Activity date: 08/22/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CA per Scott Fisher} | |
09/02/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/02/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 09/01/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR Cancel all other inspections} ; {Activity date: 08/26/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CA per Scott} ; {Activity date: 08/22/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CA per Scott Fisher} |
|
09/09/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 09/09/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
09/09/2022 | COT - RSBU - Preslab | Passed | {Activity date: 09/09/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
09/09/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 09/09/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
09/09/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 09/09/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
01/05/2023 | COT - RSBU - Roof Nailing | Passed | ||
01/05/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
03/28/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
03/28/2023 | COT - LCBU - Framing | Passed | ||
03/28/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
03/28/2023 | RSME - Mechanical Progress | Passed | ||
03/28/2023 | COT - RSEL - Construction Power | Passed | TEP ECO | |
04/17/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
07/10/2023 | COT - BULD - SWG Clearance | Passed | ||
07/12/2023 | COT - RSPL - Plumbing Final | Passed | ||
07/12/2023 | ENGR Engineering Final | Passed | ||
07/12/2023 | COT - RSEL - Electrical Final | Passed | ||
07/12/2023 | COT - RSME - Mechanical Final | Passed | ||
07/12/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
07/12/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
07/12/2023 | RSBU - Building Final | Passed | ||
07/12/2023 | COT - FCON - Sprinkler - Final | Passed |