Permit: T22CM04841
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
803 S 4TH AV
Address NEW:
803 S 4TH AV
Apply Date:
06/27/2022
Applicant:
Description:
ADU, Storage Shed and Carport
Permit Reviews
Permit Number - T22CM04841
Permit Status: Complete
Permit Description: ADU, Storage Shed and Carport
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/27/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 09/27/2022 | COMPLETED |
| 12/02/2022 | RESIDENTIAL NEW DWELLING v.1 | 12/15/2022 | APPROVED |
Conditions
Permit Number - T22CM04841
Permit Status: Complete
Permit Description: ADU, Storage Shed and Carport
| Date | Description | Comments |
|---|---|---|
| 12/15/2022 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM04841
Permite Description: ADU, Storage Shed and Carport
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/12/2023 | COT - RSEL - Electrical Underground | N/A | Not Ready | not ready for inspection at this time. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM04841
Permit Description: ADU, Storage Shed and Carport
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/12/2023 | RSPL - Plumbing Progress | Passed | ||
| 07/12/2023 | RSME - Mechanical Progress | Passed | ||
| 03/29/2023 | RSEL - Electrical Progress | Passed | ||
| 04/18/2023 | COT - RSBU - Masonry Pregrout | Passed | Speciality block (autoclave aerated concrete block)topped out at 8’4”. Ok to place grout in progress areas. | |
| 05/22/2023 | COT - RSBU - Roof Nailing | Passed | Ok,to dry in and apply metal roofing system. | |
| 07/12/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Rough Framing, Mechanical, electrical, and plumbing rough-in is complete. Okay to insulate, drywall, tape, and texture walls. | |
| 09/22/2023 | COT - BULD - SWG Clearance | Passed | Approved gas piping and pressure test, SWG clearance is required for reconnection | |
| 09/22/2023 | COT - RSPL - Gas Pressure Test | Passed | Approved gas piping and pressure test, SWG clearance is required for reconnection | |
| 10/25/2023 | BULD - Electrical Clearance | Passed | Approved 400A service panel upgrade, INCR Clearance was called into TEP at 10:30am | |
| 12/07/2023 | RSBU - Building Final | Passed | ||
| 12/07/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 12/07/2023 | COT - RSME - Mechanical Final | Passed | ||
| 12/07/2023 | COT - RSEL - Electrical Final | Passed | Electric underground to be included in this inspection. Passed | |
| 05/14/2024 | COT - RSBU - Preslab | Passed | Pass | |
| 05/14/2024 | COT - RSPL - Yard Water Line | Passed | Pass | |
| 05/14/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Pass |