Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
06/27/2022
Applicant:
Denise Dunning
Description:
SFR F50D22 T22-M0030

Outstanding Activity Conditions

Permit Number - T22CM04825
Permit Status: Issued
Permit Description: SFR F50D22 T22-M0030
Total Outstanding Activity Conditions - 4
Date Name
06/27/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/27/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
06/27/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/27/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2020-053 IS ACCEPTED AND RELEASED BY PCRWRD

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM04825
Permite Description: SFR F50D22 T22-M0030
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSBU - Roof Nailing N/A Not Ready
10/26/2022 COT - RSBU - Exterior Clips/Sheathing N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM04825
Permit Description: SFR F50D22 T22-M0030
Total Completed Inspections - 24
Date Description Inspector Results Comments
08/08/2022 COT - RSPL - Yard Water Line Passed {Activity date: 08/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/08/2022 COT - RSPL - Sewer Passed {Activity date: 08/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/08/2022 COT - RSPL - Rough Soil Passed {Activity date: 08/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/17/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 08/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
08/17/2022 COT - RSBU - Preslab Passed {Activity date: 08/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
08/17/2022 COT - RSEL - Electrical Underground Passed {Activity date: 08/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
08/17/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 08/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
11/15/2022 COT - RSBU - Roof Nailing Passed
11/15/2022 COT - RSBU - Exterior Clips/Sheathing Passed
01/23/2023 BULD - Electrical Clearance Passed clearance for TEP ECO.
01/23/2023 COT - LCPL - Plumbing Intermediate Passed
01/23/2023 RSME - Mechanical Progress Passed
01/23/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/23/2023 COT - LCBU - Framing Passed
01/23/2023 COT - RSPL - Gas Pressure Test Passed holding 15 psi.
01/23/2023 COT - RSEL - Construction Power Passed clearance for TEP ECO.
02/06/2023 COT - HCBU - Interior Shear Bracing Passed
05/15/2023 COT - BULD - SWG Clearance Passed SWG clearance issued
07/21/2023 COT - RSPL - Plumbing Final Passed
07/21/2023 COT - RSEL - Electrical Final Passed
07/21/2023 COT - RSEL - Outdoor Lighting Passed
07/28/2023 RSBU - Building Final Passed
07/28/2023 COT - RSME - Mechanical Final Passed
08/08/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW