Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
06/27/2022
Applicant:
Christi Swenson
Description:
SFR PULT3515-3 T21-M0047

Outstanding Activity Conditions

Permit Number - T22CM04819
Permit Status: Issued
Permit Description: SFR PULT3515-3 T21-M0047
Total Outstanding Activity Conditions - 4
Date Name
06/27/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/27/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
06/27/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/27/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2020-089/P21WP00061 IS ACCEPTED AND RELEASED BY PCRWRD AND NO FINAL UNTIL THE DOWNSTREAMOFFSITE PUBLIC SEWER FOR PARCEL 4 G-2020-087 IS ACCEPTED AND RELEASED BY PCRWRD

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM04819
Permite Description: SFR PULT3515-3 T21-M0047
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
12/06/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready finish connecting ductwork. space pex lines from light fixtures.
12/06/2022 COT - LCPL - Plumbing Intermediate N/A Not Ready space pex lines from light fixtures.
12/06/2022 RSME - Mechanical Progress N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM04819
Permit Description: SFR PULT3515-3 T21-M0047
Total Completed Inspections - 24
Date Description Inspector Results Comments
07/26/2022 COT - RSPL - Sewer Passed {Activity date: 07/26/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
07/26/2022 COT - RSPL - Rough Soil Passed {Activity date: 07/26/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
07/27/2022 COT - RSPL - Yard Water Line Passed {Activity date: 07/27/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} ; {Activity date: 07/26/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Not Ready}
08/03/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 08/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/03/2022 COT - RSBU - Preslab Passed {Activity date: 08/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/03/2022 COT - RSEL - Electrical Underground Passed {Activity date: 08/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/03/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 08/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
09/16/2022 COT - RSBU - Roof Nailing Passed {Activity date: 09/16/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved}
09/16/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 09/16/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved}
12/06/2022 COT - LCBU - Framing Passed
12/06/2022 COT - RSPL - Gas Pressure Test Passed holding 15 psi
12/08/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed corrections were made
12/08/2022 COT - LCPL - Plumbing Intermediate Passed corrections were made
12/08/2022 RSME - Mechanical Progress Passed
01/04/2023 COT - HCBU - Interior Shear Bracing Passed
01/17/2023 COT - RSEL - Construction Power Passed TEP ECO
01/17/2023 BULD - Electrical Clearance Passed
02/23/2023 COT - BULD - SWG Clearance Passed SWG for meter only
03/13/2023 RSBU - Building Final Passed
03/13/2023 ENGR Engineering Final Passed
03/13/2023 COT - RSME - Mechanical Final Passed
03/13/2023 COT - RSEL - Outdoor Lighting Passed
03/13/2023 COT - RSEL - Electrical Final Passed
03/13/2023 COT - RSPL - Plumbing Final Passed

Documents

File Name Document Type  
SITE PLAN.PDF CONSTRPLANS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW