Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
06/27/2022
Applicant:
Denise Dunning
Description:
SFR F60C22 T22-M0020

Permit Reviews

Permit Number - T22CM04812
Permit Status: Issued
Permit Description: SFR F60C22 T22-M0020
Start Date Submittal Complete Date Status  
06/27/2022 OTHER 08/09/2022 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T22CM04812
Permit Status: Issued
Permit Description: SFR F60C22 T22-M0020
Total Outstanding Activity Conditions - 3
Date Name
06/27/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/27/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
06/27/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Conditions

Permit Number - T22CM04812
Permit Status: Issued
Permit Description: SFR F60C22 T22-M0020
Date Description Comments
08/09/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE PERMIT.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM04812
Permite Description: SFR F60C22 T22-M0020
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSBU - Roof Nailing N/A Not Ready
10/26/2022 COT - RSBU - Exterior Clips/Sheathing N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready
COT - FCON - Sprinkler - Final N/A Not Ready contractor wasnt sure which building needed an inspection.

Completed Inspections

Permit Status: Issued
Permit Number: T22CM04812
Permit Description: SFR F60C22 T22-M0020
Total Completed Inspections - 22
Date Description Inspector Results Comments
09/02/2022 COT - RSPL - Yard Water Line Passed {Activity date: 09/02/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
09/02/2022 COT - RSPL - Sewer Passed {Activity date: 09/02/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
09/02/2022 COT - RSPL - Rough Soil Passed {Activity date: 09/02/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
09/12/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 09/12/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/09/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready. Canceled per contractor}
09/12/2022 COT - RSBU - Preslab Passed {Activity date: 09/12/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/09/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready. Canceled per contractor}
09/12/2022 COT - RSEL - Electrical Underground Passed {Activity date: 09/12/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/09/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready. Canceled per contractor}
09/12/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 09/12/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/09/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready. Canceled per contractor}
02/14/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
02/14/2023 COT - LCBU - Framing Passed
02/14/2023 COT - RSPL - Gas Pressure Test Passed
02/14/2023 RSME - Mechanical Progress Passed
02/14/2023 COT - LCPL - Plumbing Intermediate Passed
03/01/2023 COT - HCBU - Interior Shear Bracing Passed
03/21/2023 COT - RSEL - Construction Power Passed TEP ECO
05/12/2023 COT - BULD - SWG Clearance Passed SWG clearance issued
05/12/2023 COT - RSPL - Plumbing Final Passed SWG clearance issued
05/15/2023 COT - RSEL - Outdoor Lighting Passed
05/16/2023 ENGR Engineering Final Passed
05/16/2023 COT - RSEL - Electrical Final Passed
05/16/2023 RSBU - Building Final Passed
05/16/2023 COT - RSME - Mechanical Final Passed
05/18/2023 COT - FCON - Sprinkler - Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW