Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
06/23/2022
Applicant:
burak bekat
Description:
SFR BRIO1432 T20-M0058

Permit Reviews

Permit Number - T22CM04773
Permit Status: Complete
Permit Description: SFR BRIO1432 T20-M0058
Start Date Submittal Complete Date Status  
06/23/2022 OTHER 08/02/2022 COMPLETED Review Details
02/07/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/09/2024 APPROVED Review Details

Conditions

Permit Number - T22CM04773
Permit Status: Complete
Permit Description: SFR BRIO1432 T20-M0058
Date Description Comments
06/23/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/23/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
06/23/2022 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
06/23/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/23/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/23/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
07/13/2022 WATER METER SIZE
08/02/2022 Prior to permit issuance a General Contractor Letter (GCL) is required

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM04773
Permite Description: SFR BRIO1432 T20-M0058
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
03/02/2023 COT - BULD - SWG Clearance N/A Not Applicable
07/20/2023 COT - LCPL - Plumbing Intermediate N/A Not Ready
12/22/2023 COT - RSEL - Construction Power N/A Not Applicable
12/22/2023 BULD - Electrical Clearance N/A Not Applicable
12/22/2023 COT - RSBU - Sustainability N/A Not Applicable
12/27/2023 RSBU - Building Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM04773
Permit Description: SFR BRIO1432 T20-M0058
Total Completed Inspections - 19
Date Description Inspector Results Comments
01/23/2023 COT - RSPL - Sewer Passed
01/23/2023 COT - RSPL - Rough Soil Passed
02/15/2023 COT - RSBU - Preslab Passed
02/22/2023 COT - RSBU - Roof Nailing Passed
02/22/2023 COT - RSBU - Exterior Clips/Sheathing Passed
04/14/2023 COT - RSEL - Electrical Underground Passed
07/26/2023 COT - LCPL - Plumbing Intermediate Passed
07/26/2023 RSEL - Electrical Progress Passed
07/26/2023 RSME - Mechanical Progress Passed
08/08/2023 COT - HCBU - Interior Shear Bracing Passed
12/22/2023 COT - RSEL - Grounding/Bonding Passed
12/22/2023 COT - LCBU - Framing Passed
12/22/2023 COT - RSPL - Yard Water Line Passed
12/22/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
12/27/2023 COT - RSME - Mechanical Final Passed
12/27/2023 COT - RSPL - Plumbing Final Passed
12/27/2023 COT - RSEL - Electrical Final Passed
02/13/2024 ENGR Engineering Final Passed
02/20/2024 RSBU - Building Final Passed ok for C OF O

Documents

File Name Document Type  
2 BEDROOM STRUCTURAL CALCS REV1_V1.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
BLDG 109 SIC-2024-02-05_V1.PDF DOCUMENTS VIEW
APPLICATION T22CM04773.PDF DOCUMENTS VIEW
BRIOSO- WITHDRAW LETTER.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SIC BLDG 109_T22CM04773.PDF DOCUMENTS VIEW
UTILITY PLAN.PDF DOCUMENTS VIEW