Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
06/23/2022
Applicant:
Christi Swenson
Description:
SFR PULT3521-3 T21-M0049

Outstanding Activity Conditions

Permit Number - T22CM04754
Permit Status: Issued
Permit Description: SFR PULT3521-3 T21-M0049
Total Outstanding Activity Conditions - 4
Date Name
06/23/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/23/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
06/23/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/23/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2020-089/P21WP00061 IS ACCEPTED AND RELEASED BY PCRWRD AND NO FINAL UNTIL THE DOWNSTREAMOFFSITE PUBLIC SEWER FOR PARCEL 4 G-2020-087 IS ACCEPTED AND RELEASED BY PCRWRD

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM04754
Permite Description: SFR PULT3521-3 T21-M0049
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - LCBU - Framing N/A Not Ready
03/27/2023 ENGR Engineering Final N/A Complete (Recurring) There is no sidewalk on the west end of this building sidewalks need to be installed before released

Completed Inspections

Permit Status: Issued
Permit Number: T22CM04754
Permit Description: SFR PULT3521-3 T21-M0049
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/14/2022 COT - RSPL - Yard Water Line Passed {Activity date: 07/14/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 07/13/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CA per Nick}
07/14/2022 COT - RSPL - Sewer Passed {Activity date: 07/14/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 07/13/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CA per Nick}
07/14/2022 COT - RSPL - Rough Soil Passed {Activity date: 07/14/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 07/13/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CA per Nick}
07/21/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 07/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
07/21/2022 COT - RSBU - Preslab Passed {Activity date: 07/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
07/21/2022 COT - RSEL - Electrical Underground Passed {Activity date: 07/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
07/21/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 07/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
09/07/2022 COT - RSBU - Roof Nailing Passed {Activity date: 09/07/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved}
09/14/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 09/14/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/07/2022; Status: Partial Approval; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - partial, no shear wall can be less than 16”.}
11/07/2022 COT - RSPL - Gas Pressure Test Passed
11/09/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed corrections were made
11/09/2022 COT - LCBU - Framing Passed corrections were made.
11/09/2022 COT - LCPL - Plumbing Intermediate Passed corrections were made.
11/09/2022 COT - RSEL - Construction Power Passed approved. clearance for TEP ECO.
11/09/2022 RSME - Mechanical Progress Passed corrections were made
11/30/2022 COT - HCBU - Interior Shear Bracing Passed
03/22/2023 COT - RSEL - Outdoor Lighting Passed
03/22/2023 COT - RSEL - Electrical Final Passed
04/03/2023 COT - RSME - Mechanical Final Passed 4-3-23: A/C has been re-leveled. Hose bib has been installed in backyard. Post tension tag has been put on waterline coming into house. Caulking has been around tubs, toilets, and clean outs.
04/03/2023 RSBU - Building Final Passed 4-3-23: A/C has been re-leveled. Hose bib has been installed in backyard. Post tension tag has been put on waterline coming into house. Caulking has been around tubs, toilets, and clean outs.
04/03/2023 COT - RSPL - Plumbing Final Passed 4-3-23: A/C has been re-leveled. Hose bib has been installed in backyard. Post tension tag has been put on waterline coming into house. Caulking has been around tubs, toilets, and clean outs.

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW