Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2215 E 6TH ST
Address NEW:
2215 E 6TH ST
Apply Date:
06/23/2022
Applicant:
Bill Terrell
Description:
R-Guesthouse

Permit Reviews

Permit Number - T22CM04748
Permit Status: Complete
Permit Description: R-Guesthouse
Start Date Submittal Complete Date Status  
06/23/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 07/25/2022 COMPLETED Review Details
08/02/2022 RESUBMITTAL 08/15/2022 COMPLETED Review Details

Conditions

Permit Number - T22CM04748
Permit Status: Complete
Permit Description: R-Guesthouse
Date Description Comments
08/13/2022 SHOP DRAWINGS REQUIRED FOR TRUSS DRAWINGS.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM04748
Permite Description: R-Guesthouse
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSBU - Preslab N/A Not Ready
10/26/2022 COT - RSEL - Electrical Underground N/A Not Ready
12/27/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready provide DWV test. secure UFER line.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM04748
Permit Description: R-Guesthouse
Total Completed Inspections - 9
Date Description Inspector Results Comments
10/17/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 10/17/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - -AP. UG plumbing and yard water line.} ; {Activity date: 10/13/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - PA: Location only; left open for UG Plumbing inspection, which is not on permit.

}
11/08/2022 COT - RSBU - Roof Nailing Passed
11/08/2022 COT - LCBU - Framing Passed
12/27/2022 RSME - Mechanical Progress Passed
12/28/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Ok to insulate and sheet rock throughout.
03/01/2023 RSBU - Building Final Passed
03/01/2023 COT - RSPL - Plumbing Final Passed
03/01/2023 COT - RSEL - Electrical Final Passed
03/01/2023 COT - RSME - Mechanical Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
MECHANICAL SPECS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
MECHANICAL SYSTEM DESIGN REPORT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TRUSS CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TRUSS LAYOUT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
MECHANICAL SPECS.PDF DOCUMENTS VIEW
MECHANICAL SYSTEM DESIGN REPORT.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
TRUSS CALCS.PDF DOCUMENTS VIEW
TRUSS LAYOUT.PDF DOCUMENTS VIEW