Permit: T22CM04743
Permit Details
Apply Date:
06/23/2022
Applicant:
Technicians for Sustainability
Description:
R - roof mount 7.20 kW DC addition to existing photovoltaic solar system (new total system size: 11.20 kW), 18 additional DC modules, 2 additional branches, PV subpanel, 60A PV breaker connected to 27 kWh storage system; 2 batteries, NEMA 14-50 outlet
Contractors:
- Technicians for Sustainability
Permit Reviews
Permit Number - T22CM04743
Permit Status: Final
Permit Description: R - roof mount 7.20 kW DC addition to existing photovoltaic solar system (new total system size: 11.20 kW), 18 additional DC modules, 2 additional branches, PV subpanel, 60A PV breaker connected to 27 kWh storage system; 2 batteries, NEMA 14-50 outlet
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/23/2022 | OTHER | 07/07/2022 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T22CM04743
Permit Description: R - roof mount 7.20 kW DC addition to existing photovoltaic solar system (new total system size: 11.20 kW), 18 additional DC modules, 2 additional branches, PV subpanel, 60A PV breaker connected to 27 kWh storage system; 2 batteries, NEMA 14-50 outlet
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/10/2022 | RESIDENTIAL INTERMEDIATE | DQUINN | Approved | 1090.Ap |
10/10/2022 | ELECTRIC - SERVICE UPGRADE | DQUINN | Approved | 1090.Ap |
10/10/2022 | TEP CLEARANCE - PM | DQUINN | Approved | CODE DGC/BAT |
10/10/2022 | BUILDING - FINAL | DQUINN | Approved | Ap |
10/10/2022 | ELECTRIC - FINAL | DQUINN | Approved | Ap Clear dgc and batts These clearances are for an addition to the existing pv system. Close permit |